Laserfiche WebLink
pauiN . <br /> c° . 5 A N J 0 A Q U I N Environmental Health Department <br /> COUNTY <br /> Jasjit Kang, REHS, Director <br /> C�CrFoa�`,P/ Greatness grows here. Muniappa Naidu,REHS,Assistant Director <br /> PROGRAM COORDINATORS <br /> Robert McClellon, REHS <br /> Jeff Carruesco,REHS, RDI <br /> Willy Ng,REHS <br /> Melissa Nissim, REHS <br /> Steven Shih, REHS <br /> February 2, 2022 Michelle Henry, REHS <br /> To: San Joaquin County Community Development Department <br /> Attention: Alisa Goulart ��� ,� <br /> From: Aldara Salinas; (209) 616-3019 <br /> Environmental Health Specialist <br /> RE: PA-2100275 (SA)), Early Consultation, S00014650 (2632) <br /> 7500 W. Eleventh St., Tracy, Ca. <br /> The following requirements have been identified as pertinent to this project. Other requirements <br /> may also apply. These requirements cannot be modified. <br /> 1. Applicant shall contact Robert McClellon, Program Coordinator, Small Public Water <br /> System Program, at (209) 468-0332, to determine if the existing well can be permitted <br /> as a public water system prior to issuance of building permits. If a public water system is <br /> required, applicant shall submit a Small Public Water System preliminary technical <br /> report to the California State Water Resources Control Board, Division of Drinking <br /> Water (Water Board) at least six months before initiating construction of any water <br /> related improvement, as defined. The issuance of a permit to operate a small public <br /> water system by the local primacy agency (EHD) is prohibited without the concurrence <br /> of the Water Board. Please contact Brian Kidwell, P.E. with the SWRCB Division of <br /> Drinking Water at (209) 948-3963 concerning the requirements for preliminary technical <br /> report submittal prior to issuance of building permits. <br /> If the Water Board determines that an onsite well shall be used as the potable water <br /> source, a permit application to operate Small Public Water System shall be submitted to <br /> the EHD for approval prior to issuance of building permits. To issue a permit to operate, <br /> concurrence from the Water Board is required. A yearly permit to operate a public water <br /> system will be required by the EHD prior to sign off of the certificate of final occupancy <br /> (San Joaquin County Development Title, Section 9-1120.2 and 9-1115.9.). <br /> The supplier must possess adequate financial, managerial, and technical capability to <br /> assure delivery of pure, wholesome, and potable drinking water in accordance with San <br /> Joaquin County Development Title, Sections 9-1120.2 and 9-1115.9 and C.C.R., Title <br /> 22, and Health and Safety Code, Section 116525 116570. <br /> 2. A soil suitability and nitrate loading study incorporating proposed staff and customer use <br /> shall be submitted to the Environmental Health Department, indicating that the area is <br /> suitable for septic system usage. The studies must be approved by the Environmental <br /> Health Department prior to issuance of building permit(s). (San Joaquin County <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />