My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014650
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
7500
>
2600 - Land Use Program
>
PA-2100275
>
SU0014650
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:20:00 AM
Creation date
2/1/2022 2:52:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014650
PE
2632
FACILITY_NAME
PA-2100275
STREET_NUMBER
7500
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95304-
APN
25015016, -17, & -18
ENTERED_DATE
12/16/2021 12:00:00 AM
SITE_LOCATION
7500 W ELEVENTH ST
RECEIVED_DATE
2/23/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 � S . IC0Gc . <br /> S JC0G, Inc . <br /> San joagnin Colany A41111i-Species Habitat Consen)(11ion � Open 3 ace Plan <br /> 555 East Weber Avenue • Stockton, CA 95202 • (209) 235 - 0600 • FAX (209) 235- 0438 <br /> SJMSCP HOLD <br /> TO : Local Jurisdiction : Community Development Department , Planning Department , Building <br /> Department , Engineering Department , Survey Department , Transportation Department , <br /> Other : <br /> FROM : Laurel Boyd , SJCOG , Inc . <br /> DO NOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT ISSUE A BUILDING PERMIT <br /> DO NOT ISSUE FOR THIS PROJECT <br /> The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Multi - <br /> Species Habitat Conservation and Open Space Plan ( SJMSCP ) . In accordance with that agreement , the <br /> Applicant has agreed to : <br /> 1 ) SJMSCP Incidental Take Minimization Measures and mitigation requirement : <br /> 1 . Incidental Take Minimization Measures ( ITMMs ) will be issued to the project and must be signed by the <br /> project applicant prior to any ground disturbance but no later than six ( 6 ) months from receipt of the ITMMs . <br /> If ITMMs are not signed within six months , the applicant must reapply for SJMSCP Coverage . Upon receipt <br /> of signed ITMMs from project applicant, SJCOG , Inc . staff will sign the ITMMs . This is the effective date <br /> of the ITMMs . <br /> 2 . Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs . <br /> 3 . Upon issuance of fully executed ITMMs and prior to any ground disturbance , the project applicant must : <br /> a . Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> being covered (the bond should be valid for no longer than a 6 month period ) ; or <br /> b . Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered ; or <br /> c . Dedicate land in - lieu of fees , either as conservation easements or fee title ; or <br /> d . Purchase approved mitigation bank credits . <br /> 4 . Within 6 months from the effective date of the ITMMs or issuance of a building permit, whichever occurs <br /> first, the project applicant must : <br /> a . Pay the appropriate SJMSCP for the entirety of the project acreage being covered ; or <br /> b . Dedicate land in - lieu of fees, either as conservation easements or fee title ; or <br /> c . Purchase approved mitigation bank credits . <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called . <br /> Project Title : PA- 2100275 Re- Referral <br /> Landowner/Applicant : Edgar Rizkallah <br /> I <br /> Assessor Parcel #s : 250 - 15046 , 47 , 48 <br /> r <br /> T , R., Section ( s ) . <br /> Local Jurisdiction Contact : Alisa Goulart <br /> The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored and that <br /> appropriate fees are paid in compliance with the SJMSCP . <br />
The URL can be used to link to this page
Your browser does not support the video tag.