My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1330
>
2300 - Underground Storage Tank Program
>
PR0515864
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2023 9:28:57 AM
Creation date
2/2/2022 1:48:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0515864
PE
2361
FACILITY_ID
FA0012355
FACILITY_NAME
A&A GAS FOOD MART
STREET_NUMBER
1330
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120053
CURRENT_STATUS
01
SITE_LOCATION
1330 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill prevention Equipment Inspection Report Form <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (One OPE per column) 87 91 <br /> Are both vent and tank riser piping ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> secondarily contained? ® No ® No ❑ No ❑ No <br /> OPE Model EMCO EMCO <br /> Tank Manufacturer Cont Solut Cont Solut <br /> ® Shuts off ® Shuts off ❑ Shuts off ❑ Shuts off <br /> Flow Flow Flow Flow <br /> What is the OPE response when ❑ Restricts ❑ Restricts ❑ Restricts ❑ Restricts <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) ❑ Audible ❑ Audible ❑ Audible ❑ Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑Visual []Visual ❑Visual ❑Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> piping that may interfere with the OPE <br /> operation? ® No ® No ❑ No ❑ No <br /> At what level in the tank is the OPE set to 105" 105" <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank in 94% 94% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition ® Yes ® Yes ❑ Yes ❑ Yes <br /> to respond when the stored substance ❑ No ❑ No ❑ No ❑ No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results ® Pass ® Pass ❑ Pass ❑ Pass <br /> ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> Installed new drop tubes, built to correct specs. <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.