Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: A&A GAS–1330 E YOSEMITE AVE MANTECA,CA <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> LE. . . . . . . . . . . . . . . . . . . . . . . <br /> 00 <br /> P <br /> X <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> F . . . . . . . . . . . . . . . . . . . . . <br /> DSL A v X X rX� DSL. . X . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> KEY . . . . . . . . . . . . . . . . . . . . . . . . . . . ATG[] . . . . . . <br /> A=ANNULAR Sensor <br /> F=FILLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> V=VAPOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> P=PROBE . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> L=Turbine/Leak Detector *PIPING <br /> X=SUMP SENSOR . . . . . . . . . . . . . . . . . . . . . . . . . . (ARROWS) <br /> B=Brine Sensor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Drawing of piping <br /> S=Smart Sensor . . . . . . . exit of sump and <br /> C=Floats&ChainsA*'tlsmsrrxmdfhrxtwo nor lisiblero1ANceroingtachniciana-ea UDC's.No <br /> E=E Stop prgfessioral opinion ori'arel as sdei<r'fcr ir'orrraliwnl prnpcc�.£h-ring underground <br /> M1losede drawing is accurate, <br /> we cannot <br /> speculate blue <br /> Date map was drawn:11/23/20. prints. <br /> Instructions U v` <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br /> Page 6 of 6 <br />