My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014609
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
0
>
2600 - Land Use Program
>
S-78-11
>
SU0014609
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2022 12:53:50 PM
Creation date
2/3/2022 11:30:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014609
PE
2600
FACILITY_NAME
S-78-11
STREET_NUMBER
0
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
APN
08329010
ENTERED_DATE
12/9/2021 12:00:00 AM
SITE_LOCATION
HAMMER LN
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SchMid DEVELOPMENT, INC. <br /> 1081 LANGLEY AVENUE . I.VINE.CALIEOANIA 92705 • 0141540-0880 . 17141"00961 1 BUILDING /SUBDIVIDING <br /> September 13. 1973 I �t II� `' <br /> U <br /> C: t� L J� I �11 <br /> IunuS r t_° 17 1973 <br /> SAN JOAQUiN LOCAL <br /> HEALTH DISTRICT <br /> Don Layson <br /> San Joaquin County Health District <br /> 1601 E. Hazelton Avenue <br /> Stockton, California <br /> Subject: Morada West Subdivision - Tract #1027 - Water System <br /> Dear Don: <br /> In order to facilitate the development of this subdivision, at this time, we <br /> have had to scale back the development of phase I, sixty-five (65) lots, to <br /> include just those lots South of East Bay Municipal Utility District, nineteen <br /> (19). <br /> In order to develop in an orderly, and economical manner, we have decided to <br /> install one (1) complete well, pump, storage facility with emergency power <br /> supply in the Southerly location, as indicated on our plans, and defer the <br /> installation of the Northerly well, pump and storage facility until we are <br /> able to begin the development North of the EBMUD line. <br /> Schmid Development, Inc. , is willing to bond the improvements, so there is no <br /> possible hint of non-completion. <br /> The distance from the development South of EBMUD to the Northerly well site <br /> is approximately twenty-two hundred feet (2200' ), and until we cross the EBMUD <br /> line, to begin development of the Northerly portion of Phase I, it does not <br /> justify the implementation of the second site, nor do we consider that the <br /> system would be overloaded with only nineteen homes served by a system designed <br /> to handle one hundred sixteen homes. <br /> I would appreciate your decision on this matter just as fast as possible. <br /> Yours truly, <br /> C D DE MF, LCA_ <br /> f <br /> R. chael Mensinger _Olvisi-oYr-�� ager <br />
The URL can be used to link to this page
Your browser does not support the video tag.