My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014609
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
0
>
2600 - Land Use Program
>
S-78-11
>
SU0014609
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2022 12:53:50 PM
Creation date
2/3/2022 11:30:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014609
PE
2600
FACILITY_NAME
S-78-11
STREET_NUMBER
0
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
APN
08329010
ENTERED_DATE
12/9/2021 12:00:00 AM
SITE_LOCATION
HAMMER LN
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 6, 1973 <br /> Schmid Development, Inc. <br /> P. 0. Box 8236 <br /> Stockton, California 95208 <br /> Subjects Sewage Treatment Facility - Morada west Subdivision <br /> Gentlemens <br /> I have reviewed the treatment plant detail sheet, dated November 30, 1973, <br /> pertaining to the following supplemental items, which we had previously <br /> discussed. <br /> 1. Supplemental Dr eller You have increased the total number required <br /> by twenty-five 25 percent, which allows for drying out units, as I <br /> recommended, without disturbing the overall total capacity, <br /> 2. Supplemental Lands Your design allows for the replacement of the <br /> entire drywell system on contiguous land, should that unlikely event- <br /> uality become necessary. <br /> 3. Settling Ponds Placement of a settling pond between the treatment <br /> plant and drywells to settle out additional suspended solids. The <br /> size is as discussed. <br /> 4. Individual Shut-Off Valves Each distribution pipe to a drywall <br /> has its own shut-off valve to allow unlimited flexibility in deter- <br /> mining which drywalls will be used, and which will be shut down to <br /> dry out. <br /> 5. Siphon Tubes Designed so as not to pick up sludge from bottom of II <br /> settling pond, nor scum from the surface, by keeping bottom of siphon <br /> 24" off floor of pond and 36" below surface. <br /> I find that the improvements, that I recommended, have been incorporated into <br /> the latest design, and appears to constitute a sewage treatment facility that <br /> will deliver the design capacity without undue difficulty. <br /> Respectfully, <br /> L Zl <br /> George S <br /> Water Pollution Control <br /> Operational Consultant <br />
The URL can be used to link to this page
Your browser does not support the video tag.