Laserfiche WebLink
A permit from the Stete of California Reclamation <br /> Boar, has been .obtained. (See Exibit D) <br /> 2e <br /> The project°s sanitary sewage will be treated in a <br /> packsge plant on the subdivision property and the <br /> treated grater will either used for irrigation by <br /> sprinkling or returned to tete grousad in approved wells <br /> or a combination of boW In several years,, when the <br /> Cit; of Stockton venins are extended Easterly on Hammer <br /> Lane,, these sewers will be connected thereto. <br /> Preliminary Letter included (Exibit E) <br /> 3. Doweatic water for the dwelling unit will be supplied <br /> by the distribution system connected to 2 wells con- <br /> structed to San Joaquin County Standards. Since the <br /> area previously has been irrigated by on site wells and <br /> _ by water from Woodbridge Irrigation District:, there <br /> probably will be some drain on the underground supply. <br /> Since the ratio of underground water usage to Woodbridge <br /> Irrigation District water is undeterminate, the add: <br /> ition draught can not be determined.. However, it <br /> probably will be in the order of 55,500 gallons per <br /> dray, (318 x 50 x 3-1/2) <br /> B. Atmospheric Conditions <br /> This project will Of materially effect any of the <br /> neighbors because of air pollution. To the West and <br /> North are agricultural fields. To the East is U.S. <br /> 99 Freeway To the South is Reamer Lane. Both are <br /> heavily travelled, and only to the Southeast is there <br /> another: subdivision of 28 lots and a Motel and Restu. <br /> rant and 3 single family houses. <br /> A <br />