My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1151
>
2300 - Underground Storage Tank Program
>
PR0231429
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2023 3:09:41 PM
Creation date
2/7/2022 9:27:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231429
PE
2361
FACILITY_ID
FA0000819
FACILITY_NAME
ONE STOP MARKET*
STREET_NUMBER
1151
Direction
W
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
21641001
CURRENT_STATUS
01
SITE_LOCATION
1151 W LOUISE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: One Stop Market 1151 WEST LOUISE MANTECA CALIFORNIA 95336 <br /> *PIPING* <br /> (ARROWS) LOUISE AVENUE <br /> Drawing of piping <br /> exitof sump and . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> UDC's.No <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> underground <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> drawing is accurate, <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> we cannot . . . . . . . . . . . . . . . . . . . . . . . . . . . . 87. . . . . . . .DIE. . . . . . .91 . . . . . . . <br /> specutate blue <br /> prri��n�\\ts. . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . T <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . T T <br /> . 6 . . . . . . . . . . . . . . . . . . . . . Y . . . . <br /> x . . . . 8 . . . . . . . . . . . . . x O Y . . . . <br /> . 5. . . . . . . . . . . . X X <br /> X <br /> . . . . . . . . . . . . .7. . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . 2. . . . . . . . . . . . . . . . . . <br /> . x . . . . . . . . . . . . . . . <br /> . . . . . 4 . . . . . . . . . . . . . . . . . . <br /> . 1 . . . . . . . . . . . . . . . . O O A <br /> O <br /> . . . . . . . . . . . . . . . .3. . . . . . . . . . . . . . . . . <br /> O O O <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F F F . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Z <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . D <br /> 4 A A <br /> KEY <br /> TLS A=ANNULAR Sensor <br /> 350 F=FILLS <br /> V=VAPOR <br /> P=PROBE <br /> L=Turbine/Leak Detector <br /> X=SUMP SENSOR <br /> B=Brine Sensor <br /> STORE S=Smart Sensor <br /> CAS.. . . . . . . . . . . . . . . . C=Floats&Chains <br /> = <br /> @ . . . . . . . . . . . . . E E Stop <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> irenr rt are mx sfsible io t}u coroing mvisricfnn ere a <br /> p-Ok-icraal npirdan o -infers sde�fu- Drmrirg <br /> wt fo scds <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.