Laserfiche WebLink
CERS Consolidated Emergency Response / Contingency Plan <br />INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY (Check all that apply): c 1 1 <br />M 1. VERBAL WARNINGS; MI 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; • 3. TELEPHONE; <br />M 4. PAGERS; • 5. ALARM SYSTEM; • 6. PORTABLE RADIO <br />NO .11FICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY (Check all that apply): C12 <br />I. VERBAL WARNINGS; • 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; MI 3. TELEPHONE; <br />III 4. PAGERS; • 5. ALARM SYSTEM; NI 6. PORTABLE RADIO <br />EMERGENCY COORDINATOR CONTACT INFORMATION: Cl 3. <br />PRIMARY EMERGENCY COORDINATOR NAME: PHONE NO.: PHONE NO.: <br />ALTERNATE EMERGENCY COORDINATOR NAME: PHONE NO.: PHONE NO.: <br />Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO.: <br />Note: If more than one alternate emergency coordinator is designated, attach a list in order of responsibility. <br />D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br />Check the applicable boxes to indicate your facility's procedures for containing spills and preventing and mitigating releases, fires and/or explosions. <br />DI <br />1. MONITOR FOR LEAKS, RUPTURES, PRESSURE BUILD-UP, ETC.; <br />IN 2. PROVIDE STRUCTURAL PHYSICAL BARRIERS (e.g., Portable spill containment walls, built-in berms); <br />3. PROVIDE ABSORBENT PHYSICAL BARRIERS (e.g., Pads, spill pigs, spill pillows); <br />4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br />5. LINED TRENCH DRAINS AND/OR SUMPS; <br />M 6. AUTOMATIC FIRE SUPPRESSION SYSTEM; <br />. 7. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br />1:: I 8. STOP PROCESSES AND/OR OPERATIONS; <br />0 9. AUTOMATIC / ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br />0 10. SHUT OFF WATER, GAS, ELECTRICAL UTILITIES; <br />CALL 9-1-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br />NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br />III 13. ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFfER EVACUATION; <br />III 14. PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br />15. REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br />16. HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br />17. USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br />18. VACUUM SUCTION USING APPROPRIATE VACUUM (e.g., Intrinsically safe) FOR SPILL CONTROL AND/OR CLEANUP; <br />19. DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br />20. PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br />21. OTHER (Specify): D2. <br />E. FACILITY EVACUATION <br />THE FOLLOWING ALARM SIGNAL(S) WILL BE USED TO BEGIN EVACUATION OF THE FACILITY (Check all that apply): El. <br />1. BELLS; E2. <br />2. HORNS/SIRENS; <br />3. VERBAL (i.e., Shouting); <br />4. OTHER (Specify): <br />THE FOLLOWING LOCATION(S) WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S) (e.g., Parking lot, street corner): E3. <br />Note: The Emergency Coordinator must account for all onsite employees and visitors after evacuation. <br />EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: E4 <br />I. WRITTEN PROCEDURES DESCRIBING ROUTES, EXITS, AND ASSEMBLY AREAS; <br />2. EVACUATION MAP(S) DEPICTING ROUTES, EXITS, AND ASSEMBLY AREAS; <br />II 3. OTHER (Specify): ES <br />Note: Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan. <br />F. ARRANGEMENTS FOR EMERGENCY SERVICES <br />ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES (Check one of the following): <br />1. HAVE BEEN DETERMINED NOT NECESSARY; F2. 2. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE (Specify): <br />Note: Advance arrangements with local fire and police departments, hospitals, state and local emergency response teams, and/or emergency services <br />contractors should be made for your facility, if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br />Rev. 03/07/17 <br /> Page 2 of 4