Laserfiche WebLink
FACILITY # .EMployee Name <br />EMERGENCY RESPONSE/UST MONITORING ALARM TRAINING <br />Training Checklist <br />-Emergency licespoose--Tooii& Procedures <br />"Visually" pointed out and reviewed with the Trainee each of the following: <br />fi" I:21 L (initial) Spill Response items (Hydrocarbon Response Bags, extra pads, absorbent, broom & dust pan, MoGas spill <br />yr, utgi.te): ielxnipitrain:Hdazsparfrdkooveit <br />us <br /> iNfisarsetfe.7amerre. <br />lsdc:a.vnalfeadridTrraeirxiltrolg Pmatceiond6ere.5 eHxpe tattwnto tiplen:cEleedsjuregnsa refediati9P6rtoat thrjrravisnrceC rurpcurousernot- <br />te went barrels and procedures when depositing items in them <br />Rif (initial) Location of (all) Fire Extinguishers- (inside & outside): watked the Trainee to each one. <br />)0_,..- (initial) Location of (ail) Fire Alarm Pull Stations"- if applicable: waaied the Trainee to each one <br />Ai (initial) Location of (all) Emergency Shutoff switches - (inside & outside)! walked the Trainee In each one. <br />11 ..... <br />(initial) Electrical Service Main Breaker - Water Main Valves - (if applicable- Natural Gas Shutoff & Sprinkler Controls & <br />Kiser walked the Trainee to each one and reptained how to access & operate them <br />(initial) Emergency Response Binder: revrewed -air the documents in Me binder and the procedures when ektaceatng <br />(initial) Location of (all) CO2 (bulk or canisters). CO2 sensors, CO2 alarms with placard (backroorn and c-store) — <br />walked the Trainee to all G02 equipmeal and explained procedures relating to theif use, i.e. purpose for sensor light and the drfteient <br />alarms Refer to "Des:gnaled 0;:ezatcr Training CumC.ulunf. <br />Reviewed and explained all the procedures for the following: <br />(initial) Steps to Shut-Down and Evacuate <br />(initial) First Aid Procedures for Exposure to Gasoline & Diesel <br />(initial) Small IL Large Gasoline t Diesel spill and a non-gasoline vehicle-fluid spill cleanup procedure (Spill Response <br />dures). <br />(initial) Site Specific Linerriency Response & Training Plan <br />(initial) HMBP <br />MS1AM9n. wing SW** <br />iostructed the T ra;nee on the following <br />1 ,'i- Reporting Procithzies <br />Monitoring Equipment <br /> <br />(initial) Took Trainee to the TLNI System. <br />(Initial) Reviewed the site's specific type of ILIA system (\feeder-Root, In-Conn, etc.) <br />(initial) Discussed the equipment operating procedures (components & functions). <br />Alarm Reporting Procedures <br />gf FE (initial) Reviewed the Visual & Audible alerts. <br />— (initial) Demonstrated process for silencing the audible alarm. <br />.)1f (initial) Reviewed the (2) categories of alarms (UST& ISD). Discussed the Quick Reference Alarm Card and the means of <br />diAtingulshing a Vapor Alarm from an ISO Alarm. <br />J" r- (initial) Reviewed the reporting process for Air Quality Alarms, i.e. record alarm in iSD Binder (tab 1), record in <br />Maintenance Binder, and the timelines for reporting an Air Quality alarm to maintenance. <br />1,2_L (initial) Reviewed the reporting process for UST Alarms, i.e. record alarm in the Maintenance Binder, and immediately <br />report alarm to maintenance, <br />, , i .raince Signature E_ <br />T_ <br />Date: .....,--/ i .2. <br />Designated Operator Signature I- ily <br /> <br />gap/ gelediftet, 8 60137 Date: <br />File in employee station file onl) Revised 512300