Laserfiche WebLink
dist!. <br /> Percent of Riser pera id <br /> Buoyant Load for I ' J Lspa_An/ Il�ap,il <br /> the Effected Straps l // <br /> Mr = ( 63 . 8 63 . 8 ) • in riser size <br /> 0 0 0 <br /> 50 0 83 <br /> 50 0 149 <br /> 0 0 198 <br /> 0 0 284 <br /> per — • % L — • in <br /> a 0 0 a 367 <br /> 0 0 453 <br /> 0 50 502 <br /> 0 50 568 <br /> 0 0 651 <br /> Tension to Affected BFIJ Strap tension will be the riser buoyant <br /> TAP r = — • pera load distributed to each affected strap <br /> Straps p— i , j 2 i , j divided by 2 since there are 2 anchor <br /> points per strap . <br /> ODIT = ( 63 . 8 63 . 8 ) • in riser size <br /> Tank Buoyancy, Loves Ripon , Store 223 , Date Printed : 6/12/2020 Page 22 of 25 <br /> Ripon CA, Dwg 22022-001 , 10 ft Dia , <br />