My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
INSTALL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 4:00:04 PM
Creation date
2/10/2022 9:06:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2022
RECORD_ID
PR0516526
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0012659
FACILITY_NAME
LOVES COUNTRY STORES OF CALIFORNIA #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1553 COLONY RD RIPON 95366
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
441
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WESTERN <br /> PUMP <br /> CONSI k UCTI c) N <br /> Purpose <br /> This standard outlines the general requirements for the site safety , permitting and <br /> installation of Underground Tanks ( UST ) information contained herein applies to typical <br /> instances and may not address all circumstances . <br /> Code References <br /> 2019 California Fire Code ( CFC ) Chapter 22 & 34 <br /> California Health and Safety Code Ch . 6 . 7 <br /> California Code of Regulations Title 23 Ch . 16 <br /> Permit(s ) Required <br /> A UST Installation permit is required for the installation of all underground storage tanks <br /> intended to be utilized for the storage of hazardous substances . <br /> For all electrical work associated with the UST installation a separate permit shall be obtained <br /> from the local Building Department . <br /> Attachments <br /> 1 . ) Plan Review Checklist - UST Installation <br /> 2 . ) Inspection Checklist — UST Installation ( Required Inspections ) <br /> 3 . ) UST Tank Placement — The UST must be inspected , and a pressure test verified by the local <br /> authorities prior to placing it into the ground . <br /> 4 . ) UST Pipe Test — All piping shall be tested as per the manufacture specifications . <br /> 5 . ) UST Monitoring Test — A complete functional test must be performed for the monitoring <br /> system . The Fire Department Inspector must witness testing . <br /> 6 . ) Enhanced Leak Detection Test ( ELD ) — A State Water Resources Control Board approved <br /> ELD test must be completed and passed prior to start- up . <br /> Page 1 of 10 <br /> (888 ) 239 -9988 SAN DIEGO LOS ANGELES PHOENIX westernpump . com <br />
The URL can be used to link to this page
Your browser does not support the video tag.