o Manufacturer , model , and serial numbers . <br /> o Audible and visual alarms were operational , and if printable , a copy attached . <br /> o If alarms are relayed to remote monitoring station , must show all communications <br /> equipment ( e . g . modem ) were operational . <br /> o Monitoring system set- up has proper settings , and if printable , a copy attached , <br /> o Testing apparatus properly calibrated . <br /> o All equipment manufacturers ' maintenance checklist is completed and attached . <br /> o All LLD ' s were operational and accurate within regulatory requirements . <br /> o If deficiencies were found , how and when they would be corrected . <br /> o All LLD ' s were operational and accurate within regulatory requirements . o If <br /> deficiencies were found , how and when they would be corrected . <br /> Refer to the following documents for further information . <br /> SWRCB Local Guidance letter 162 - 1 ( LG 162 - 1 ) And <br /> SWRCB " Summary Table of Underground Storage Tank ( UST ) Leak Prevention & Enforcement <br /> Provisions of Assembly Bill (AB ) 2481 & AB 1702 " Construction Verifications/Testing Notes • <br /> Tank Set — Ensure the following ; o All coated steel tanks are tested with an electric <br /> resistance holiday detector prior to install . <br /> o All double walled fiberglass tanks are received on site with a vacuum on the annular <br /> space . <br /> o Pressure test of the tank shall be performed prior to placement of tank in the pit . <br /> o Tanks are set gently as to not damage the tank . <br /> o Post installation testing conducted to verify condition o Dead - men are non -ferrous <br /> metal . <br /> • Piping install - Ensure the following : o Piping slope . Minimum '/ inch <br /> per foot . o Contractor verified primary and secondary soap test . o Double <br /> walled product lines , vent , vapor riser and annular. <br /> • Sump install — Ensure the following o Double walled sumps . If <br /> sections , confirm attachment method will maintain an intact annular . <br /> o Transition of vacuum to other sumps is through double walled monitored piping . <br /> o If hydrostatically monitored , verify method to fill ( bottom up/vacuum ) o Boots <br /> installed to maintain annular communication . <br /> • UDC install — Ensure the following o <br /> Double walled UDC ' s <br /> o If hydrostatically monitored , verify method to fill ( bottom up/vacuum ) <br /> (888 ) 239 - 9988 SAN DIEGO LOS ANGELES PHOENIX westernpump . com <br /> Page 10 of 11 <br />