Laserfiche WebLink
WESTERN PUMP USPSf�Mfifie/SystemUPe�ade f ! <br /> Step 1 : INSTALL ELECTRICAL CONDUIT Step 2: Step 3 : <br /> WHAT IS THE <br /> WORST THAT <br /> COULD STRUCK BY FALLING MATERIAL <br /> HAPPEN? <br /> DON'T BE IN THE TRENCH WHILE <br /> PREVENTION MATERIAL IS BEING PLACED <br /> PLAN (Focus KEEP GOOD , SAFE WORK LIMITS <br /> on _.. _ <br /> Behaviors) <br /> HOW ARE <br /> YOU TRENCH CAVE-IN _ <br /> MOST LIKELY _ <br /> TO GET <br /> HURT? <br /> STAY WITHIN SAFE WORK AREA <br /> MAINTAIN GOOD COMMUNICATION <br /> PREVENTION WITH OTHERS AND OPERATOR <br /> PLAN (Focus - - - - <br /> on Behaviors) <br /> OTHER RISKS FALL HAZARDS // SLIP HAZARDS <br /> TO BE <br /> AWARE OF? - — <br /> PREVENTION MAINTAIN 3 POINTS OF CONTACT <br /> PLAN (Focus WHILE ENTERING AND EXITING <br /> on Behaviors) THE TRENCH USING LADDERS <br /> Training ..._........ <br /> Equipment) MAKE SURREE LADDER IS SECURE <br /> Support AND TIED OFF AS NEEDED <br /> Page 2 of 4 <br />