My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
INSTALL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2024 9:57:37 AM
Creation date
2/10/2022 9:06:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2022
RECORD_ID
PR0516526
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0012659
FACILITY_NAME
LOVES COUNTRY STORES OF CALIFORNIA #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\lsauers1
Supplemental fields
Site Address
1553 COLONY RD RIPON 95366
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
New Construction Fittings FS Seri <br /> BpAVO es <br /> Poe <br /> PROBLEM SOLVED Half- Body - Dimensions <br /> NEW CONSTRUCTION <br /> - - J <br /> 'i <br /> z- <br /> Half- Body FRP Pass -Through Entry Fittings for Single - or <br /> Doublewall FRP Sumps Flat Sump Wall <br /> DescriptionPipe type Part # <br /> 3/4" galvanized F-07-5-F 3/4" galvanized conduit, half-body pass-through for flat walls, EPDXY REQ' D <br /> conduit <br /> 3/4" PVC coated F-0711-S- F 3/4" PVC coated conduit, half- body pass-through for flat walls, EPDXY REQ' D <br /> conduit <br /> 1 " galvanized F- 10-S-F 1 " galvanized conduit, half-body pass-through for flat walls, EPDXY REQ' D <br /> conduit <br /> 1 " PVC coated F- 10R-S-F 1 " PVC coated conduit, half-body pass-through for flat walls, EPDXY REQ' D <br /> conduit <br /> 2 " FRP F-20-S-F 2 " FRP, half- body pass-through for flat walls, EPDXY REQ' D <br /> 3 " FRP F-30-S- F 3 " FRP, half-body pass-through for flat walls, EPDXY REQ' D <br /> 4" FRP F-40-S-F 4" FRP, half-body pass-through for flat walls, EPDXY REQ' D <br /> 2" LCX FRP F-20L-S- F 2 " LCX, half- body pass-through for flat walls, EPDXY REQ' D <br /> 3 " LCX FRP F-30L-S- F 3 " LCX, half- body pass-through for flat walls, EPDXY REQ' D <br /> 4 " LCX FRP F-40L-S- F 4" LCX, half-body pass-through for flat walls, EPDXY REQ' D <br /> EP- 100 Bravo 7 oz. standard epoxy kit; use with FRP, steel, PVC, and PVDF <br /> Page 2 of 2 Innovative Solutionsfor • • • ry Containment DS- 8 , 02.06 , 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.