Laserfiche WebLink
2' auiN SAN J OAQ U I N Environmental Health Department <br /> Q - Kang ,Jas , REHS , Director <br /> � � COUNTY 1 g <br /> cq iF0R��P Greatness grows here . Muniappa Naiclu, REHS , Assistant Director <br /> PROGRAM COORDINATORS <br /> Robert McClellon , REHS <br /> Jeff Carruesco , REHS , RDI <br /> Willy Ng , REHS <br /> Melissa Nissim , REHS <br /> Steven Shih , REHS <br /> March 16 , 2022 Michelle Henry, REHS <br /> Nik Zagorov <br /> Eco - Chek Compliant , Inc . <br /> PO Box 1394 <br /> Lafayette , CA 94549 <br /> Re : North Pole Gas & Food Revised SR0084878 <br /> 574 W Grant Line Rd , Tracy , CA 95376 <br /> The San Joaquin County Environmental Health Department ( EHD ) has completed the review of the <br /> application for a permit to do the following on the underground storage tank ( UST) system at the above <br /> noted address : <br /> • replace the direct- bury 87 and 91 spill container <br /> • replace 91 drop tube <br /> The permit has been approved with the following conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control District for <br /> any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for approval prior to <br /> commencing work . All new addenda supersede the previous ones . <br /> 3 . Provide written notification to ust ( sigov . orq to arrange the following inspection appointments <br /> ( a 48- hour notice is required for inspection appointments) . <br /> a . Corrosion protection : Verify corrosion protection for direct bury spill bucketrip or to <br /> backfilling . <br /> b . Spill bucket test : Verify minimum 5 -gallon capacity and pass a one hour hydrostatic test (or <br /> equivalent) , after concrete is set . Proper drainage must also be verified . <br /> c . Overfill prevention verification : Measurement of drop tubes to verify 95 % tank volume shut <br /> off. Verification of flapper functionality . Ensure that all pertinent tank charts and <br /> calculations are available for review at the time of inspection . <br /> d . Verification that ball float (s ) , if installed , do not interfere with the installed flapper valve . <br /> e . Since concrete will be broken near the 87 and 91 tanks , a secondary containment test must <br /> be performed on the 87 and 91 tanks once concrete is poured in accordance with the <br /> manufacturer' s guidelines . <br /> Please be aware that the facility cannot receive fuel in the 87 and 91 tank prior to the EHD <br /> inspection and approval . <br /> 4 . Individuals installing underground storage tank system components must possess or work <br /> under the direct and personal supervision of an individual physically present at the work site <br /> who possesses all of the following : <br /> a . A valid , current contractor' s license issued by the Contractors State License Board <br /> 1868 E . Hazelton Avenue I Stockton , California 95205 1 T 209 468-3420 1 F 209 464 - 0138 1 www . sjgov . org /ehd <br />