Laserfiche WebLink
SCOPE OF WORK <br /> Replace failed Hydrostatic Test Tank Regular 87 Fill Container. <br /> • Barricade site work during petroleum construction <br /> • Saw cut tank slab at one area for the new containment box (approximately <br /> 4 ' x4 ' x8 ") <br /> • Break out and remove all concrete from excavated area and dispose <br /> • Remove existing pea gravel for installation (stockpile pea gravel onsite for reuse) <br /> • Remove existing fill containment box <br /> • Install new fill containment box <br /> • Test fill containment box per local regulatory requirements <br /> • <br /> Backfill excavation areas with existing ea gravel and re concrete <br /> Demonstrate passing Spill Bucket test for the Inspector to confirm regulatory compliance. <br /> Replace Tank Premium Fill Container. <br /> • Barricade site work during petroleum construction <br /> • Saw cut tank slab at one area for the new containment box (approximately <br /> 4 ' x4 ' x8 ") <br /> • Break out and remove all concrete from excavated area and dispose <br /> • Remove existing pea gravel for installation (stockpile pea gravel onsite for reuse) <br /> • Remove existing fill containment box <br /> • Install new fill containment box <br /> • Test fill containment box per local regulatory requirements <br /> Backfill excavation areas with existing ea gravel and re concrete <br /> Demonstrate passing Spill Bucket test for the Inspector to confirm regulatory compliance. <br /> Install new OPW Overfill Valve NON TESTABLE - 71SO for Premium Tank. <br /> • Remove existing drop tube with Overfill Valve. <br /> • Measure and Assemble Overfill Valve to restrict flow less than 95 % per local <br /> regulatory requirements <br /> • Install the new NON-TESTABLE Overfill Valve <br /> Perform OPW Overfill Valve Inspection and submit a report. <br /> Demonstrate passing Overfill Valve test for the Inspector to confirm regulatory <br /> compliance. <br /> 1 <br />