My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
574
>
2300 - Underground Storage Tank Program
>
PR0231405
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2023 5:42:33 AM
Creation date
2/10/2022 9:23:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231405
PE
2361
FACILITY_ID
FA0003164
FACILITY_NAME
NORTH POLE GAS & FOOD INC
STREET_NUMBER
574
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
574 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF WORK <br /> Replace failed Hydrostatic Test Tank Regular 87 Fill Container. <br /> • Barricade site work during petroleum construction <br /> • Saw cut tank slab at one area for the new containment box (approximately <br /> 4 ' x4 ' x8 ") <br /> • Break out and remove all concrete from excavated area and dispose <br /> • Remove existing pea gravel for installation (stockpile pea gravel onsite for reuse) <br /> • Remove existing fill containment box <br /> • Install new fill containment box <br /> • Test fill containment box per local regulatory requirements <br /> • <br /> Backfill excavation areas with existing ea gravel and re concrete <br /> Demonstrate passing Spill Bucket test for the Inspector to confirm regulatory compliance. <br /> Replace Tank Premium Fill Container. <br /> • Barricade site work during petroleum construction <br /> • Saw cut tank slab at one area for the new containment box (approximately <br /> 4 ' x4 ' x8 ") <br /> • Break out and remove all concrete from excavated area and dispose <br /> • Remove existing pea gravel for installation (stockpile pea gravel onsite for reuse) <br /> • Remove existing fill containment box <br /> • Install new fill containment box <br /> • Test fill containment box per local regulatory requirements <br /> Backfill excavation areas with existing ea gravel and re concrete <br /> Demonstrate passing Spill Bucket test for the Inspector to confirm regulatory compliance. <br /> Install new OPW Overfill Valve NON TESTABLE - 71SO for Premium Tank. <br /> • Remove existing drop tube with Overfill Valve. <br /> • Measure and Assemble Overfill Valve to restrict flow less than 95 % per local <br /> regulatory requirements <br /> • Install the new NON-TESTABLE Overfill Valve <br /> Perform OPW Overfill Valve Inspection and submit a report. <br /> Demonstrate passing Overfill Valve test for the Inspector to confirm regulatory <br /> compliance. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.