Laserfiche WebLink
<br />i <br />TABLE OF CONTENTS <br />1.0 SOIL SUITABILITY STUDY ........................................................................................................... 1  <br />1.1 INTRODUCTION ............................................................................................................................... 1  <br />1.1.1 Description of Site, Including Zone Information ........................................................................... 1  <br />1.1.2 Description of Proposed Development ........................................................................................... 1  <br />1.1.3 Parcel Vicinity Location Map ........................................................................................................ 1  <br />1.1.4 Site Map Showing Location of All Items on Parcels (i.e., Structures, Drives, Wells, Septic <br />Systems, Large Trees, Pastures, Pools, Natural Drainage Courses, Ponds, Waterways, Etc.) ................ 1  <br />1.2 PRESENT AND PAST USES OF THE SITE .................................................................................... 2  <br />1.3 EXISTING AND PROPOSED SEPTIC TANK USAGE ................................................................... 2  <br />1.3.1 Existing On-Site Septic Tank Usage .............................................................................................. 2  <br />1.3.2 Site Septic Permit History .............................................................................................................. 2  <br />1.3.3 On-Site Septic Tank Repair History ............................................................................................... 2  <br />1.3.4 Existing Septic Tank Usage in The General Area .......................................................................... 2  <br />1.3.5 General Area Septic Permit History ............................................................................................... 3  <br />1.3.6 General Area Septic Tank Repair History ...................................................................................... 3   <br />1.3.7 Proposed or Expected Maximum Septic Tank Usage on Site ........................................................ 3  <br />1.4 GROUNDWATER INFORMATION ................................................................................................. 3  <br />1.4.1 Depth and Gradient of Groundwater in the General Area .............................................................. 3  <br />1.4.2 Existing and/or Potential Groundwater Contamination Issues in the General Location ................ 4  <br />1.4.3 Location, Type, and Construction of Well Water Sample(s) ......................................................... 4  <br />1.4.4 Constituents Being Tested for in the Water Sample ...................................................................... 4  <br />1.4.5 Sample Collection and Handling Methodology ............................................................................. 4  <br />1.4.6 Complete Chain of Custody Documentation .................................................................................. 4  <br />1.5 SOIL PROFILE INFORMATION ...................................................................................................... 4  <br />1.5.1 Site Map Showing Location, with Dimensions, of the Soil Profile Pit on the Parcel .................... 5  <br />1.5.2 Description of Soil Profile Pit Including Depth and Dimensions .................................................. 5  <br />1.5.3 Soil Lithology ................................................................................................................................. 5  <br />1.5.4 Discussion of Soil Lithology as Related to Future Onsite Septic Uses .......................................... 5  <br />1.6 PERCOLATION TEST INFORMATION SECTION ........................................................................ 5  <br />1.6.1 Site Map Showing the Location of the Percolation Test Holes ...................................................... 5  <br />1.6.2 Number of Shallow and Deep Percolation Tests was Performed for Each Parcel ......................... 5  <br />1.6.3 Description of the Date, Time, and Protocol Used to Prepare the Test Hole ................................. 6  <br />1.6.4 Description of the Date, Time and Condition of the Test Hole After the 24-Hour Soak Period ... 6  <br />1.6.5 Compliance with SJC Policy EHD 02-02 ...................................................................................... 6  <br />1.6.6 Percolation Test Form with REHS Verification Signature ............................................................ 6  <br />1.6.7 Discussion of Any Potential Problems Predicted and/or the Need for an Engineered or <br />Alternative Septic System ........................................................................................................................ 6  <br />1.6.8 Discussion of Percolation Rates in Relation to the Type, Size and Location of Future Leach <br />Fields Needed at the Site ......................................................................................................................... 6  <br />2.0 NITRATE LOADING STUDY .......................................................................................................... 6  <br />2.1 CHEMICAL AND PHYSICAL PROPERTIES OF SOIL ................................................................. 7  <br />2.1.1 Chemical and Physical Properties of the Soils Underlying the Site ............................................... 7  <br />2.1.2 Mass Transport Properties of the Soils Underlying the Site with Respect to Nitrate and/or any <br />Other Constituent of Concern Identified for the Project Site .................................................................. 7  <br />2.2 GROUNDWATER ANALYSIS ......................................................................................................... 7   <br />2.2.1 Depth to Groundwater, Seasonal Fluctuations of Groundwater Depth, Directional Flow and <br />Gradient ................................................................................................................................................. 7