MONITORING NOTES <br />A. THE UNDERGROUND STORAGE TANK (USTs), TANK SUMPS, VENT TRANSITION / CONTAINMENT SUMP, AND UNDER DISPENSER CONTAINMENT (UDC) SUMPS ARE ALL DOUBLE WALLED, WITH LIQUID FILLED INTERSTICE, HYDROSTATICALLY <br />MONITORED. ALL SUMPS ARE ALSO MONITORED BY A LIQUID SENSING PROBE W/IN EACH SUMP. <br />B THE PI PING ISALL DOUBLE WALLED, WITH A VACUUM FILLED INTERSTICE, WHICH IS MONITORED FOR THE PRES NGE 0= LIaUID AN CHANGES IN THE VACUUM PRESSURE, W/ SENSORS IN THE TUR51NE SUM S. THE VENT PI PING <br />INTERSTICE IS MAN11=0LDED IN THE VENT TRANSITION / CONTAINMENT SUMP AND MONITORED W/IN THE 91 OCTANE GASOLINE SUMP. THE VAPOR RECOVERY PIPING INTERSTICE IS MAN11=0LDED AND MONITORED W/IN THE 5-1 OCTANE <br />GASOLINE SUMP. EACH PRODUCT PIPE INTERSTICE IS MONITORED W/IN ITS TURBINE SUMP, <br />C. THE PRESSURIZED PRODUCT PIPING IS MONITORED BY AN ELECTRONIC LINE LEAK DETECTOR, LOCATED AT THE SUBMERSIBLE TURBINE PUMP (STP)MANIFOLD ASSEMBLY, WHICH WILL AUTOMATICALLY SHUT DOWN THE TURBINE IF AN <br />ALARM OCCURS. <br />D. USTs ARE EQUIPPED W/ POSITIVE 5HUT-01=1= DEVICES ON THE FILL TUBES, SET FORB551. OF TANK CAPACITY, MAX. THE USTs ALSO HAVE AUTOMATIC TANK GAUGES (ATGs) WHICH MONITOR CHANGES IN THE LEVEL OF PRODUCT AND <br />WATER IN THE TANKS. ATGs PROVIDE OVERFILL ALARM AND REPORT, ONLY, AT 90510 OF TANK CAPACITY, W/O STP SHUTDOWN. <br />E. AUTO STP SHUTDOWN WILL OCCUR ON A LIQUID -SENSING PROBE ALARM THAT IS W/IN A SUMP THAT NAS PRESSURIZED PRODUCT PIPING, I.E. TURBINE SUMPS AND UDCs. LIQUID -SENSING PROBES W/IN SUMPS THAT HAVE NO <br />PRESSURIZED PRODUCT PIPING, I.E. FILL SUMPS AND THE VENT TRANSITION / CONTAINMENT SUMP, MAY ALARM, W/O STP SHUTDOWN. VACUUM SENSORS MAY WARN ONLY, W/O STP SHUTDOWN, IN THE ABSENCE OF- LIQUID DETECTION. <br />LIQUID DETECTED BY THE VACUUM SENSING SYSTEM WILL ALARM AND SHUT DOWN THE STP. THE HYDROSTATIC PROBE FOR THE UST INTERSTICE MAY ALARM, W/O STP SHUTDOWN, PER TLS SYSTEM PROGRAMMING. <br />F. IN -STATION DIAGNOSTICS (ISD) WILL ALARM AND SHUT DOWN TURBINE FOR CERTAIN DESIGNATED ALARMS. <br />G. AUTO STP SHUTDOWN WILL ALSO OCCUR IF ANY OF THE MONITORING SYSTEM 1=AIL5 OR IS DISCONNECTED. <br />FUEL SYSTEM KEYNOTES ami <br />1. NEW UNDERGROUND STORAGE TANKS (USTs). DOUBLE-WALL 1=I5ERGLAS5 REINFORCED PLASTIC (1=.R.P.) TANKS <br />W/ LIQUID -FILLED ANNULAR/INTERSTICE, DEADtIEN AND HOLD-DOWNS, BY XERXES. ONE 25K S-1 OCTANE <br />UNLEADED GASOLINE. ONE 20K SPLIT TANK, W/ 10K 91 OCTANE UNLEADED GASOLINE AND 10K DIESEL. <br />2. NEW (N) TANK VENT RISERS ON (N) RISER RACK. INSTALL LISTED FLEX CONNECTORS AT BASE AND CONNECT <br />TO TANK VENT PIPING, WITHIN (N) DOUBLE -WALLED, LIQUID -FILLED INTERSTICE, CONTAINMENT / TERMINATION <br />SUMP. MANIFOLD GASOLINE VENT RISERS. PROTECT W/ BOLLARDS, AS SHOWN, <br />3. INSTALL NEW VEEDER-ROOT ENHANCED VAPOR RECOVERY (EVR) CARBON CANISTER VAPOR POLISHER <br />(CCVP) SYSTEM AT 1 1AN11=0LDED GASOLINE VENT RISER. INSTALL PER 1"1N1=R. RECOMMENDATIONS AND <br />CURRENT C.A.R.B. EXECUTIVE ORDER VR -204-X (Z). MAINTAIN MATERIAL / EQUIPMENT CLEARANCES PER <br />1" 1N1=R. INSTALLATION PROCEDURE. <br />4. NEW VACUUM MONITORED, CONTAINED TANK VENT PIPING, 1=15ERGLA56 REINFORCED PLASTIC (1=.R.P.), MINIMUM <br />PRIMARY PIPE SIZE TO BE 2"0. SLOPE BACK TO TANKS AT 1/S" PER FOOT, MINIMUM. <br />5. NEW DISPENSERS ON NEW DOUBLE -WALLED, LIQUID -FILLED INTERSTICE, UNDER DISPENSER CONTAINMENT <br />(UDC) / SHEAR VALVE SYSTEMS, W/ FLOAT SWITCH SUMP PROBES, TYPICAL. CONFIRM DISPENSING MODELS W/ <br />EQUIPMENT LIST, INSTALL IN -STATION DIAGNOSTICS (I.S.D.) VAPOR FLOW METER ABOVE VAPOR SHEAR <br />VALVE. PROVIDE CONDUIT, 5EAL-01=1=5 AND WIRE PER MN1=R. INSTALLATION PROCEDURES. TYPICAL Or (2) <br />3+0's AND (4) 3+1's. <br />�o. INSTALL SINGLE I.S.D. PRESSURE SENSOR AT VENT 1"1AN11=0LD (ALT. - IN VAPOR LINE BELOW DISPENSER <br />CLOSEST TO USTs), <br />1, NEW VACUUM MONITORED, CONTAINED PHASE 11 VAPOR RECOVERY PIPING, 1=.R.P., MINIMUM 3"0 PRIMARY <br />PIPING FROM DISPENSERS TO GASOLINE TANKS, TYPICAL. 2" PRIMARY PIPING OK TO SINGLE DISPENSER. <br />SLOPE TO TANKS AT 1/S" PER FOOT, MIN. <br />8. NEW VACUUM MONITORED, CONTAINED F.R.P. PRODUCT PIPE W/ 2"0, MINIMUM, PRIMARY PIPE, TYPICAL. SLOPE <br />TO TANKS AT 1/S" PER FOOT, MIN. <br />9. TANK ANNULAR RISER W/ HYDROSTATIC PROBE AND 1" IANWAY, TYPICAL. <br />10. NEW AUTOMATIC TANK GAUGES W/IN TURBINE SUMP, TYPICAL, <br />11. NEW SUBMERSIBLE TURBINE PUMPS (STP), TYPICAL, W/IN DOUBLE -WALLED, LIQUID -FILLED INTERSTICE, 1=.R.P. <br />CONTAINMENT SUMP W/ FLOAT SWITCH SUMP PROBE, LID, AND 1 IANWAY ASSEMBLY. AUTO STP SHUTDOWN ON <br />PROBE ALARM AND IF ANY OF THE MONITORING SYSTEM FAILS OR IS DISCONNECTED. <br />12. NEW ENHANCED VAPOR RECOVERY (EVR) TANK FILL ASSEMBLY W/ 5 GALLON (MIN.) FILL CONTAINMENT <br />(TYPICAL OF 3) AND 5 GALLON (MIN.) CONTAINMENT 1=0R AT PHASE I VAPOR RECOVERY AT GASOLINE TANKS <br />(TYPICAL 01= 2), W/IN DOUBLE -WALLED, LIQUID -FILLED INTERSTICE, CONTAINMENT SUMP, W/ FLOAT SWITCH SUMP <br />PROBE, AND 1" IANWAY ASSEMBLY. <br />13. BACKFILL TRENCHES W/ PEA GRAVEL TO LEVEL REQUIRED FOR NEW SLURRY COVER AND PAVING BASE. <br />PROVIDE CONCRETE 4" THICK MIN. OVER PEA GRAVEL. <br />14. NEW CONCRETE DRIVE SLAB, MINIMUM ro" THICK W/ #4 BARS AT 18" O.C. BOTH WAYS, OVER 4" OF 3/4" CRUSHED <br />ROCK OVER ro" AGG. BASE. CONFIRM MIN. PAVING DESIGN MATCHES CIVIL/STRUCTURAL ENGINEERING RECS. <br />AND GEOTECHNICAL REPORT RECS.. CONFIRM SLAB CONFIGURATION W/ ARCHITECTURAL AND/OR CIVIL <br />SHEETS. <br />15, NEW S" THICK, (AT /o%" BURY), CONCRETE TANK SLAB W/ *4 REBAR AT 18" O.C. BOTH WAYS. CONFIRM SLAB <br />REQUIREMENTS W/ CIVIL AND/OR STRUCTURAL DOCUMENTS. <br />1(o. NEW FUEL SYSTEM PANELS, CONTROLS, MONITORING CONSOLE AND ALARM IN (N) BUILDING. INSTALL NEW <br />MONITORING SYSTEM, CONTROLS AND DISPENSER INTERFACE COMPONENTS, AS REQUIRED. <br />1-1. OVERFILL ALARM WITH ACKNOWLEDGMENT SWITCH. MOUNT ON THE VENT RAGK, VISIBLE FROM THE UST <br />TANKER -FILL POSITION. <br />18. NEW CONC. FILLED BOLLARDS, TYPICAL 01= FOUR (4) PER DISPENSER. ro" 5a.,42" HIGH, INSTALL PER DETAIL. <br />19. NEW EMERGENCY 5HUT-01=1=5 (ESO). INSTALL (1) ON THE STORE FRONT W/ VISIBLE SIGN. SEE GENERAL NOTES. <br />CONFIRM LOCATION W/ FIRE DEPT. APPROVALS. <br />20. CONTRACTOR SHALL PAINT ALL EXPOSED METALS, UNLESS PREI=INISHED, W/ SUITABLE PAINT IN APPROVED <br />COLORS. <br />21. PIPING IS SHOWN SCHEMATIC, AND MAY BE EXAGGERATED FOR DRAFTING CLARITY. VARIATIONS DUE TO <br />FIELD CONDITIONS FOUND ARE EXPECTED. PROVIDE "AS -BUILT" PLAN SHOWING CONFIGURATIONS AS <br />INSTALLED. <br />22. PROVIDE ALL FUEL SYSTEM TESTING REQUIRED FOR THE OPENING OF THE FACILITY, INCLUDING 65989, <br />ENHANCED LEAK DETECTION (ELD) FINAL TESTING FOR THE NEW SYSTEM, MONITORING CERTIFICATION, AIR <br />QUALITY PRE 4 FINAL TESTING, ETC., AS APPROPRIATE. <br />23. ALL SECONDARY CONTAINMENT SYSTEMS WILL BE CONSTRUCTED TO PREVENT ANY WATER INTRUSION INTO THE <br />SYSTEM BY PRECIPITATION, INFILTRATION, OR SURFACE RUNOFF. <br />GENERAL NOTES <br />A. PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED IN ACCORDANCE WITH CALIFORNIA FIRE CODE (CFC) <br />SECTION 2305.5 AND 9O(o. INSTALL AT LEAST TWO PORTABLE FIRE EXTINGUISHER (1=.E.) W/ A MINIMUM RATING <br />OF 2 -A:20 -5:C AS SHOWN. THESE EXTINGUISHERS TO BE AFFIXED TO A LOCATION ON A MOUNTING BRACKET <br />OR IN A FIRE EXTINGUISHER CABINET, AND LOCATED NOT MORE THAN -15 FEET FROM PUMPS, DISPENSERS OR <br />STORAGE TANK 1=1LL-PIPE OPENINGS. <br />B. A CLEARLY LABELED, MANUALLY OPERATED PUMP MASTER SWITCH SHALL BE PROVIDED IN AN APPROVED <br />LOCATION W/IN 100 FEET, BUT NOT NEARER THAN 20 FEET TO, ANY DISPENSER. WHERE SUCH MASTER SWITCH <br />IS NOT VISIBLE FROM ALL DISPENSERS, THE LOCATION THEREOF SHALL BE INDICATED BY APPROVED SIGNS. <br />SIGNS IDENTIFYING THE PUMP MASTER SWITCH SHALL BE LABELED "EMERGENCY FUEL 5HUT01=1= THE MASTER <br />SWITCH ON ALL INDIVIDUAL PUMP CIRCUIT SWITCHES SHALL BE SET IN THE "OFF" POSITION 5E1=0RE CLOSING <br />THE STATION FOR BUSINESS AT ANY TIME. (CFC 2303.2) <br />C. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED AND TESTED PER 1" IANUI=ACTURER'S INSTRUCTIONS, <br />APPLICABLE CODES AND STANDARDS, THE PLANS AND 5PEC11=1CATION5, AND LOCAL AGENCY <br />REQUIREMENTS. <br />D. FUEL SYSTEM CONTRACTORS AND INSTALLERS SHALL HAVE ALL CURRENTLY REQUIRED EQUIPMENT <br />1" IANUI=ACTURERS' CERTIFICATIONS AND APPROVALS FOR INSTALLATION OF ALL OF THE FUEL SYSTEM <br />RELATED WORK, INCLUDING FUEL SYSTEM ELECTRICAL COMPONENTS, AND SHALL PROVIDE A COMPLETE, <br />WORKABLE FUEL SYSTEM PER 1" IANUI=ACTURERS' AND CODES' REQUIREMENTS. THE FUEL SYSTEM'S <br />ELECTRICAL SYSTEMS INCLUDE, BUT ARE NOT LIMITED TO, HIGH 8 LOW VOLTAGE POWER, MONITORING AND <br />COMMUNICATIONS (INTERCOM 4 CONTROL) REQUIREMENTS. <br />E. TANK 8 DRIVE SLAB CONCRETE SHALL BE CAPABLE OF PASSING A MINIMUM COMPRESSIVE STRENGTH OF <br />2500 PSI AFTER 28 DAYS, AND SHALL OTHERWISE FOLLOW THE CONCRETE DESIGN AS 5PEC11=1ED IN THE <br />CIVIL/ARCH DOCUMENTS. EXPANSION JOINTS AT DRIVE AND TANK SLABS SHALL BE SEALED W/ FUEL <br />COMPATIBLE MATERIALS. <br />F. MATERIALS OF CONSTRUCTION FOR UNDERGROUND STORAGE TANKS, PIPING AND SECONDARY CONTAINMENT <br />SYSTEMS SHALL BE COMPATIBLE WITH THE STORED HAZARDOUS SUBSTANCES, INCLUDING ALCOHOLS <br />(METHANOL, ETHANOL, ETC.) AND ALCOHOL -GASOLINE MIXTURES, WHICH SHALL BE DOCUMENTED AS <br />COMPATIBLE BY THE 1" IANUI=ACTURER AND/OR BY AN APPROVED INDEPENDENT TESTING ORGANIZATION. <br />G. CONSPICUOUSLY POST WARNING SIGNS WITHIN SIGHT OF EACH DISPENSER FACE, PER CFC 2305.(o. <br />9�D ARCS\ <br />I-q��4�,Qy�EL <br />c� <br />* 1-7 <br />NO. C ff 64 <br />'�� REN.3-31-$3 <br />CALS�/ <br />U <br />z <br />6-) <br />4LLI <br />LLI W >N� <br />J Xn�m,� <br />���z�ww <br />� a <br />Z o <br />lU <br />w <br />V' <br />U <br />Q) w <br />MONITORING NOTES <br />A. THE UNDERGROUND STORAGE TANK (USTs), TANK SUMPS, VENT TRANSITION / CONTAINMENT SUMP, AND UNDER DISPENSER CONTAINMENT (UDC) SUMPS ARE ALL DOUBLE WALLED, WITH LIQUID FILLED INTERSTICE, HYDROSTATICALLY <br />MONITORED. ALL SUMPS ARE ALSO MONITORED BY A LIQUID SENSING PROBE W/IN EACH SUMP. <br />B THE PI PING ISALL DOUBLE WALLED, WITH A VACUUM FILLED INTERSTICE, WHICH IS MONITORED FOR THE PRES NGE 0= LIaUID AN CHANGES IN THE VACUUM PRESSURE, W/ SENSORS IN THE TUR51NE SUM S. THE VENT PI PING <br />INTERSTICE IS MAN11=0LDED IN THE VENT TRANSITION / CONTAINMENT SUMP AND MONITORED W/IN THE 91 OCTANE GASOLINE SUMP. THE VAPOR RECOVERY PIPING INTERSTICE IS MAN11=0LDED AND MONITORED W/IN THE 5-1 OCTANE <br />GASOLINE SUMP. EACH PRODUCT PIPE INTERSTICE IS MONITORED W/IN ITS TURBINE SUMP, <br />C. THE PRESSURIZED PRODUCT PIPING IS MONITORED BY AN ELECTRONIC LINE LEAK DETECTOR, LOCATED AT THE SUBMERSIBLE TURBINE PUMP (STP)MANIFOLD ASSEMBLY, WHICH WILL AUTOMATICALLY SHUT DOWN THE TURBINE IF AN <br />ALARM OCCURS. <br />D. USTs ARE EQUIPPED W/ POSITIVE 5HUT-01=1= DEVICES ON THE FILL TUBES, SET FORB551. OF TANK CAPACITY, MAX. THE USTs ALSO HAVE AUTOMATIC TANK GAUGES (ATGs) WHICH MONITOR CHANGES IN THE LEVEL OF PRODUCT AND <br />WATER IN THE TANKS. ATGs PROVIDE OVERFILL ALARM AND REPORT, ONLY, AT 90510 OF TANK CAPACITY, W/O STP SHUTDOWN. <br />E. AUTO STP SHUTDOWN WILL OCCUR ON A LIQUID -SENSING PROBE ALARM THAT IS W/IN A SUMP THAT NAS PRESSURIZED PRODUCT PIPING, I.E. TURBINE SUMPS AND UDCs. LIQUID -SENSING PROBES W/IN SUMPS THAT HAVE NO <br />PRESSURIZED PRODUCT PIPING, I.E. FILL SUMPS AND THE VENT TRANSITION / CONTAINMENT SUMP, MAY ALARM, W/O STP SHUTDOWN. VACUUM SENSORS MAY WARN ONLY, W/O STP SHUTDOWN, IN THE ABSENCE OF- LIQUID DETECTION. <br />LIQUID DETECTED BY THE VACUUM SENSING SYSTEM WILL ALARM AND SHUT DOWN THE STP. THE HYDROSTATIC PROBE FOR THE UST INTERSTICE MAY ALARM, W/O STP SHUTDOWN, PER TLS SYSTEM PROGRAMMING. <br />F. IN -STATION DIAGNOSTICS (ISD) WILL ALARM AND SHUT DOWN TURBINE FOR CERTAIN DESIGNATED ALARMS. <br />G. AUTO STP SHUTDOWN WILL ALSO OCCUR IF ANY OF THE MONITORING SYSTEM 1=AIL5 OR IS DISCONNECTED. <br />FUEL SYSTEM KEYNOTES ami <br />1. NEW UNDERGROUND STORAGE TANKS (USTs). DOUBLE-WALL 1=I5ERGLAS5 REINFORCED PLASTIC (1=.R.P.) TANKS <br />W/ LIQUID -FILLED ANNULAR/INTERSTICE, DEADtIEN AND HOLD-DOWNS, BY XERXES. ONE 25K S-1 OCTANE <br />UNLEADED GASOLINE. ONE 20K SPLIT TANK, W/ 10K 91 OCTANE UNLEADED GASOLINE AND 10K DIESEL. <br />2. NEW (N) TANK VENT RISERS ON (N) RISER RACK. INSTALL LISTED FLEX CONNECTORS AT BASE AND CONNECT <br />TO TANK VENT PIPING, WITHIN (N) DOUBLE -WALLED, LIQUID -FILLED INTERSTICE, CONTAINMENT / TERMINATION <br />SUMP. MANIFOLD GASOLINE VENT RISERS. PROTECT W/ BOLLARDS, AS SHOWN, <br />3. INSTALL NEW VEEDER-ROOT ENHANCED VAPOR RECOVERY (EVR) CARBON CANISTER VAPOR POLISHER <br />(CCVP) SYSTEM AT 1 1AN11=0LDED GASOLINE VENT RISER. INSTALL PER 1"1N1=R. RECOMMENDATIONS AND <br />CURRENT C.A.R.B. EXECUTIVE ORDER VR -204-X (Z). MAINTAIN MATERIAL / EQUIPMENT CLEARANCES PER <br />1" 1N1=R. INSTALLATION PROCEDURE. <br />4. NEW VACUUM MONITORED, CONTAINED TANK VENT PIPING, 1=15ERGLA56 REINFORCED PLASTIC (1=.R.P.), MINIMUM <br />PRIMARY PIPE SIZE TO BE 2"0. SLOPE BACK TO TANKS AT 1/S" PER FOOT, MINIMUM. <br />5. NEW DISPENSERS ON NEW DOUBLE -WALLED, LIQUID -FILLED INTERSTICE, UNDER DISPENSER CONTAINMENT <br />(UDC) / SHEAR VALVE SYSTEMS, W/ FLOAT SWITCH SUMP PROBES, TYPICAL. CONFIRM DISPENSING MODELS W/ <br />EQUIPMENT LIST, INSTALL IN -STATION DIAGNOSTICS (I.S.D.) VAPOR FLOW METER ABOVE VAPOR SHEAR <br />VALVE. PROVIDE CONDUIT, 5EAL-01=1=5 AND WIRE PER MN1=R. INSTALLATION PROCEDURES. TYPICAL Or (2) <br />3+0's AND (4) 3+1's. <br />�o. INSTALL SINGLE I.S.D. PRESSURE SENSOR AT VENT 1"1AN11=0LD (ALT. - IN VAPOR LINE BELOW DISPENSER <br />CLOSEST TO USTs), <br />1, NEW VACUUM MONITORED, CONTAINED PHASE 11 VAPOR RECOVERY PIPING, 1=.R.P., MINIMUM 3"0 PRIMARY <br />PIPING FROM DISPENSERS TO GASOLINE TANKS, TYPICAL. 2" PRIMARY PIPING OK TO SINGLE DISPENSER. <br />SLOPE TO TANKS AT 1/S" PER FOOT, MIN. <br />8. NEW VACUUM MONITORED, CONTAINED F.R.P. PRODUCT PIPE W/ 2"0, MINIMUM, PRIMARY PIPE, TYPICAL. SLOPE <br />TO TANKS AT 1/S" PER FOOT, MIN. <br />9. TANK ANNULAR RISER W/ HYDROSTATIC PROBE AND 1" IANWAY, TYPICAL. <br />10. NEW AUTOMATIC TANK GAUGES W/IN TURBINE SUMP, TYPICAL, <br />11. NEW SUBMERSIBLE TURBINE PUMPS (STP), TYPICAL, W/IN DOUBLE -WALLED, LIQUID -FILLED INTERSTICE, 1=.R.P. <br />CONTAINMENT SUMP W/ FLOAT SWITCH SUMP PROBE, LID, AND 1 IANWAY ASSEMBLY. AUTO STP SHUTDOWN ON <br />PROBE ALARM AND IF ANY OF THE MONITORING SYSTEM FAILS OR IS DISCONNECTED. <br />12. NEW ENHANCED VAPOR RECOVERY (EVR) TANK FILL ASSEMBLY W/ 5 GALLON (MIN.) FILL CONTAINMENT <br />(TYPICAL OF 3) AND 5 GALLON (MIN.) CONTAINMENT 1=0R AT PHASE I VAPOR RECOVERY AT GASOLINE TANKS <br />(TYPICAL 01= 2), W/IN DOUBLE -WALLED, LIQUID -FILLED INTERSTICE, CONTAINMENT SUMP, W/ FLOAT SWITCH SUMP <br />PROBE, AND 1" IANWAY ASSEMBLY. <br />13. BACKFILL TRENCHES W/ PEA GRAVEL TO LEVEL REQUIRED FOR NEW SLURRY COVER AND PAVING BASE. <br />PROVIDE CONCRETE 4" THICK MIN. OVER PEA GRAVEL. <br />14. NEW CONCRETE DRIVE SLAB, MINIMUM ro" THICK W/ #4 BARS AT 18" O.C. BOTH WAYS, OVER 4" OF 3/4" CRUSHED <br />ROCK OVER ro" AGG. BASE. CONFIRM MIN. PAVING DESIGN MATCHES CIVIL/STRUCTURAL ENGINEERING RECS. <br />AND GEOTECHNICAL REPORT RECS.. CONFIRM SLAB CONFIGURATION W/ ARCHITECTURAL AND/OR CIVIL <br />SHEETS. <br />15, NEW S" THICK, (AT /o%" BURY), CONCRETE TANK SLAB W/ *4 REBAR AT 18" O.C. BOTH WAYS. CONFIRM SLAB <br />REQUIREMENTS W/ CIVIL AND/OR STRUCTURAL DOCUMENTS. <br />1(o. NEW FUEL SYSTEM PANELS, CONTROLS, MONITORING CONSOLE AND ALARM IN (N) BUILDING. INSTALL NEW <br />MONITORING SYSTEM, CONTROLS AND DISPENSER INTERFACE COMPONENTS, AS REQUIRED. <br />1-1. OVERFILL ALARM WITH ACKNOWLEDGMENT SWITCH. MOUNT ON THE VENT RAGK, VISIBLE FROM THE UST <br />TANKER -FILL POSITION. <br />18. NEW CONC. FILLED BOLLARDS, TYPICAL 01= FOUR (4) PER DISPENSER. ro" 5a.,42" HIGH, INSTALL PER DETAIL. <br />19. NEW EMERGENCY 5HUT-01=1=5 (ESO). INSTALL (1) ON THE STORE FRONT W/ VISIBLE SIGN. SEE GENERAL NOTES. <br />CONFIRM LOCATION W/ FIRE DEPT. APPROVALS. <br />20. CONTRACTOR SHALL PAINT ALL EXPOSED METALS, UNLESS PREI=INISHED, W/ SUITABLE PAINT IN APPROVED <br />COLORS. <br />21. PIPING IS SHOWN SCHEMATIC, AND MAY BE EXAGGERATED FOR DRAFTING CLARITY. VARIATIONS DUE TO <br />FIELD CONDITIONS FOUND ARE EXPECTED. PROVIDE "AS -BUILT" PLAN SHOWING CONFIGURATIONS AS <br />INSTALLED. <br />22. PROVIDE ALL FUEL SYSTEM TESTING REQUIRED FOR THE OPENING OF THE FACILITY, INCLUDING 65989, <br />ENHANCED LEAK DETECTION (ELD) FINAL TESTING FOR THE NEW SYSTEM, MONITORING CERTIFICATION, AIR <br />QUALITY PRE 4 FINAL TESTING, ETC., AS APPROPRIATE. <br />23. ALL SECONDARY CONTAINMENT SYSTEMS WILL BE CONSTRUCTED TO PREVENT ANY WATER INTRUSION INTO THE <br />SYSTEM BY PRECIPITATION, INFILTRATION, OR SURFACE RUNOFF. <br />GENERAL NOTES <br />A. PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED IN ACCORDANCE WITH CALIFORNIA FIRE CODE (CFC) <br />SECTION 2305.5 AND 9O(o. INSTALL AT LEAST TWO PORTABLE FIRE EXTINGUISHER (1=.E.) W/ A MINIMUM RATING <br />OF 2 -A:20 -5:C AS SHOWN. THESE EXTINGUISHERS TO BE AFFIXED TO A LOCATION ON A MOUNTING BRACKET <br />OR IN A FIRE EXTINGUISHER CABINET, AND LOCATED NOT MORE THAN -15 FEET FROM PUMPS, DISPENSERS OR <br />STORAGE TANK 1=1LL-PIPE OPENINGS. <br />B. A CLEARLY LABELED, MANUALLY OPERATED PUMP MASTER SWITCH SHALL BE PROVIDED IN AN APPROVED <br />LOCATION W/IN 100 FEET, BUT NOT NEARER THAN 20 FEET TO, ANY DISPENSER. WHERE SUCH MASTER SWITCH <br />IS NOT VISIBLE FROM ALL DISPENSERS, THE LOCATION THEREOF SHALL BE INDICATED BY APPROVED SIGNS. <br />SIGNS IDENTIFYING THE PUMP MASTER SWITCH SHALL BE LABELED "EMERGENCY FUEL 5HUT01=1= THE MASTER <br />SWITCH ON ALL INDIVIDUAL PUMP CIRCUIT SWITCHES SHALL BE SET IN THE "OFF" POSITION 5E1=0RE CLOSING <br />THE STATION FOR BUSINESS AT ANY TIME. (CFC 2303.2) <br />C. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED AND TESTED PER 1" IANUI=ACTURER'S INSTRUCTIONS, <br />APPLICABLE CODES AND STANDARDS, THE PLANS AND 5PEC11=1CATION5, AND LOCAL AGENCY <br />REQUIREMENTS. <br />D. FUEL SYSTEM CONTRACTORS AND INSTALLERS SHALL HAVE ALL CURRENTLY REQUIRED EQUIPMENT <br />1" IANUI=ACTURERS' CERTIFICATIONS AND APPROVALS FOR INSTALLATION OF ALL OF THE FUEL SYSTEM <br />RELATED WORK, INCLUDING FUEL SYSTEM ELECTRICAL COMPONENTS, AND SHALL PROVIDE A COMPLETE, <br />WORKABLE FUEL SYSTEM PER 1" IANUI=ACTURERS' AND CODES' REQUIREMENTS. THE FUEL SYSTEM'S <br />ELECTRICAL SYSTEMS INCLUDE, BUT ARE NOT LIMITED TO, HIGH 8 LOW VOLTAGE POWER, MONITORING AND <br />COMMUNICATIONS (INTERCOM 4 CONTROL) REQUIREMENTS. <br />E. TANK 8 DRIVE SLAB CONCRETE SHALL BE CAPABLE OF PASSING A MINIMUM COMPRESSIVE STRENGTH OF <br />2500 PSI AFTER 28 DAYS, AND SHALL OTHERWISE FOLLOW THE CONCRETE DESIGN AS 5PEC11=1ED IN THE <br />CIVIL/ARCH DOCUMENTS. EXPANSION JOINTS AT DRIVE AND TANK SLABS SHALL BE SEALED W/ FUEL <br />COMPATIBLE MATERIALS. <br />F. MATERIALS OF CONSTRUCTION FOR UNDERGROUND STORAGE TANKS, PIPING AND SECONDARY CONTAINMENT <br />SYSTEMS SHALL BE COMPATIBLE WITH THE STORED HAZARDOUS SUBSTANCES, INCLUDING ALCOHOLS <br />(METHANOL, ETHANOL, ETC.) AND ALCOHOL -GASOLINE MIXTURES, WHICH SHALL BE DOCUMENTED AS <br />COMPATIBLE BY THE 1" IANUI=ACTURER AND/OR BY AN APPROVED INDEPENDENT TESTING ORGANIZATION. <br />G. CONSPICUOUSLY POST WARNING SIGNS WITHIN SIGHT OF EACH DISPENSER FACE, PER CFC 2305.(o. <br />9�D ARCS\ <br />I-q��4�,Qy�EL <br />c� <br />* 1-7 <br />NO. C ff 64 <br />'�� REN.3-31-$3 <br />CALS�/ <br />w (31 <br />U <br />z <br />6-) <br />4LLI <br />LLI W >N� <br />J Xn�m,� <br />���z�ww <br />�mm <br />lU <br />w <br />V' <br />U <br />Q) w <br />Q (3,Q`4m�U <br />(P <br />`n <br />W <br />(V <br />W <br />0 <br />O W rr <br />Z <br />W <br />O <br />J <br />6 <br />ai <br />N <br />I L <br />Q <br />�0',m <br />10 <br />W <br />O <br />Q <br />1.0 <br />D <br />w (31 <br />wUX <br />LLI i5 -4 <br />LL <br />4LLI <br />LLI W >N� <br />J Xn�m,� <br />���z�ww <br />0 <br />lU <br />CV r� <br />U O W (Yl <br />U <br />Q) w <br />Q (3,Q`4m�U <br />(P <br />`n <br />c() <br />`� d <br />W <br />Q) Ci <br />Q) W <br />Ez <br />!ll <br />U <br />Q <br />J p <br />JW <br />OQ� D�zm <br />OVLL �m <br />O o on <br />WSW(3N <br />W <br />OQ <br />V= <br />a � <br />} <br />4LLI <br />PET=l <br />lU <br />OF 10 <br />"FET" SHEETS <br />ff <br />W <br />`t `Q <br />W <br />ai <br />N <br />I L <br />Q <br />10 <br />W <br />O <br />Q <br />Q <br />J p <br />JW <br />OQ� D�zm <br />OVLL �m <br />O o on <br />WSW(3N <br />W <br />OQ <br />V= <br />a � <br />} <br />PET=l <br />lU <br />OF 10 <br />"FET" SHEETS <br />ff <br />W <br />Q <br />U z 0 <br />> Qww� <br />(J) LLI � <br />Z -1O 6 <br />W °�WDm W N <br />Ul Q Of <br />zLw0 <br />aW0F- y3:-4 <br />7fyij <br />�a <br />w Z O as zfLL <br />y (Y <br />Z affo <br />= a <br />J - Z z=QNw°� o <br />�z z <br />M O (K <br />�z� QLwwN U <br />a Q :Vo- 0 z <br />OEM W-50 <br />Neu <br />F- fy <br />PET=l <br />OF 10 <br />"FET" SHEETS <br />