My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
5749
>
2800 - Aboveground Petroleum Storage Program
>
PR0515802
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 4:39:32 PM
Creation date
2/22/2022 8:52:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0515802
PE
2832
FACILITY_ID
FA0021241
FACILITY_NAME
TRACY MUNICIPAL AIRPORT
STREET_NUMBER
5749
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
5749 S TRACY BLVD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> FUEL.,E <br /> R <br /> LOADING P <br /> R <br /> OCEDURE <br /> 1. Apply handbrake to vehicle. <br /> 2. Turn off engine. <br /> 3. Switch off vehicle electrical system. 3` <br /> 4. Ensure vehicle P.T.O,disengaged. <br /> 5. Check/Ensure vehicle is at correct product grade loading <br /> position. <br /> �d 6. Bond truck. <br /> 7. Place wheel chocks in position(open brake interlocks). <br /> 8. Remove dust cap and ensure correct product grade hose is 1 1 1 <br /> chosen and connect loading coupling. <br /> 9. Take loading meter totalizer reading and ensure meter <br /> register at zero.' <br /> 10. Open loading coupling. L A <br /> 11. Start loading pump. <br /> 12. Activate deadman. <br /> 13. Initiate high level shut off precheck. <br /> y" 14. Continue to load vehicle if high level precheck OK. <br /> K�, e 15. Complete vehicle filling. <br /> s <br /> 16. Disconnect hose and reinstall dust caps. <br /> �u �a 17. Record meter reading. <br /> 18. Disconnect bonding cable. <br /> 19. After 10 minutes settling,carry out Q.C.tests. <br /> s r . <br /> Figure 1.2: Site Diagram /Tank Sketch <br /> D�PJ � ry <br /> rq pis, <br /> Ll �V , `'��°�?fP� ' .n �e <br /> �t45 <br /> VI <br /> r'1 <br /> AQ6Rs IOb�L AV6AS �oaw <br /> �IO(�&PL- BDOaCA\- <br /> LL1� <br />
The URL can be used to link to this page
Your browser does not support the video tag.