Laserfiche WebLink
GENERAL NOTES <br />C1.1 <br />GENERAL NOTES: <br />1.PRIOR TO AND DURING CONSTRUCTION, THE CONTRACTOR <br />SHALL BE RESPONSIBLE FOR BEING FAMILIAR WITH THE <br />CURRENT SAN JOAQUIN COUNTY STANDARDS AND ALL <br />UPDATES AND REVISIONS MADE TO ANY OF THE SAN JOAQUIN <br />COUNTY STANDARD DETAILS. THE CONTRACTOR IS ALSO <br />RESPONSIBLE FOR BEING FAMILIAR WITH THE WRITTEN <br />SPECIFICATIONS AND/OR OTHER STANDARD DETAILS NOT <br />SHOWN BUT WHICH ARE INCLUDED IN THE "SAN JOAQUIN <br />COUNTY STANDARD SPECIFICATIONS AND PLANS". <br />2.DRAWING NUMBERS SHOWN ON THE PLANS REFER TO SAN <br />JOAQUIN COUNTY STANDARD PLANS, SHOWN THUS: DWG. NO. <br />3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING <br />FROM DAMAGE ALL EXISTING IMPROVEMENTS THAT ARE TO <br />REMAIN. SUCH IMPROVEMENTS THAT ARE DAMAGED BY THE <br />CONTRACTOR SHALL BE REPLACED AT HIS EXPENSE. <br />4.ALL TRENCH EXCAVATION SHALL BE IN ACCORDANCE WITH <br />SAN JOAQUIN COUNTY STANDARD SPECIFICATION 2-5.0. <br />5.THE CONTRACTOR SHALL DEMOLISH, EXCAVATE, REMOVE <br />AND DISPOSE OF ALL EXISTING CONCRETE CURB, GUTTER OR <br />SIDEWALK, ASPHALT CONCRETE PAVING, AND DELETERIOUS <br />MATERIAL AS REQUIRED TO CONSTRUCT THE CONTRACT <br />WORK. ALL SUCH EXCESS MATERIAL GENERATED SHALL BE <br />DISPOSED OF FROM THE SITE BY THE CONTRACTOR. <br />6.EXISTING UTILITIES ARE SHOWN AS THEY ARE BELIEVED TO <br />EXIST. OTHER UNDERGROUND UTILITIES SUCH AS <br />ELECTRICAL, GAS, PHONE AND ETC. MAY EXIST WITHIN AND <br />ADJACENT TO THE PROJECT AREA. THE OWNER AND THE <br />ENGINEER DO NOT ACCEPT RESPONSIBILITY FOR THEIR <br />ACCURACY. PRIOR TO COMMENCING ANY WORK, THE <br />CONTRACTOR SHALL HAVE EACH UTILITY COMPANY <br />ACCURATELY LOCATE IN THE FIELD THEIR MAINS AND <br />SERVICE LINES. IT SHALL BE THE CONTRACTOR'S <br />RESPONSIBILITY TO PROTECT ALL EXISTING UTILITIES. THE <br />CONTRACTOR SHALL NOTIFY MEMBERS OF THE <br />UNDERGROUND SERVICE ALERT (U.S.A.) 48 HOURS IN <br />ADVANCE OF PERFORMING EXCAVATION WORK BY CALLING <br />THE TOLL-FREE NUMBER (1-800-227-2600). IT SHALL BE <br />CONTRACTOR'S SOLE RESPONSIBILITY TO PROTECT ALL <br />EXISTING UTILITIES SO THAT NO DAMAGE RESULTS TO THEM <br />DURING THE PERFORMANCE OF HIS CONTRACT. THE <br />CONTRACTOR SHALL BE REQUIRED TO COOPERATE WITH <br />OTHER CONTRACTORS AND UTILITY COMPANIES INSTALLING <br />NEW STRUCTURES, UTILITIES AND SERVICES TO THE <br />DEVELOPMENT. <br />7.ATTENTION IS CALLED TO: SECTION 1540 (A) (1) OF THE <br />CONSTRUCTION SAFETY ORDERS (TITLE 8 CALIFORNIA <br />ADMINISTRATION CODE SECTION 1540), ISSUED BY THE <br />OCCUPATIONAL SAFETY AND HEALTH STANDARDS BOARD <br />PURSUANT TO THE CALIFORNIA OCCUPATIONAL SAFETY AND <br />HEALTH ACT OF 1973, AS AMENDED, WHICH STATES: "PRIOR <br />TO OPENING AN EXCAVATION, EFFORT SHALL BE MADE TO <br />DETERMINE WHETHER UNDERGROUND INSTALLATION I.E., <br />SEWER, WATER, FUEL, ELECTRIC LINES, ETC., WILL BE <br />ENCOUNTERED AND, IF SO, WHERE SUCH UNDERGROUND <br />INSTALLATIONS ARE LOCATED. WHEN THE EXCAVATION <br />APPROACHES THE APPROXIMATE LOCATION OF SUCH AN <br />INSTALLATION, THE EXACT LOCATION SHALL BE DETERMINED <br />BY CAREFUL PROBING OR HAND DIGGING AND WHEN IT IS <br />UNCOVERED, ADEQUATE PROTECTION SHALL BE PROVIDED <br />FOR THE EXISTING INSTALLATION. ALL KNOWN OWNERS OF <br />UNDERGROUND FACILITIES IN THE AREA CONCERNED SHALL <br />BE ADVISED OF PROPOSED WORK AT LEAST 48 HOURS PRIOR <br />TO THE START OF ACTUAL EXCAVATION." <br />8.WHENEVER EXISTING PAVEMENT IS BROKEN OR CUT DURING <br />THE INSTALLATION OF THE WORK COVERED BY THESE PLANS <br />AND SPECIFICATIONS, THE PAVEMENT SHALL BE REPLACED, <br />AFTER PROPER BACK FILLING, WITH PAVEMENT MATERIALS <br />EQUAL TO OR BETTER THAN THE MATERIALS USED IN THE <br />ORIGINAL PAVING. THE FINISHED PAVEMENT SHALL BE <br />SUBJECT TO THE APPROVAL OF THE OWNER'S <br />REPRESENTATIVE. <br />9.THE CONTRACTOR SHALL EXPOSE EXISTING STORM DRAINS <br />AND SANITARY SEWERS WHERE CONNECTIONS ARE TO BE <br />MADE SO EXISTING FLOWLINES AND LOCATIONS CAN BE <br />VERIFIED BEFORE THE START OF CONSTRUCTION. <br />10.THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE <br />AND COMPLETE RESPONSIBILITY FOR JOBSITE CONDITIONS <br />DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT <br />INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, THAT <br />THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT <br />BE LIMITED TO NORMAL WORKING HOURS. <br />11."CLASS A SUBGRADE" SHALL BE GRADED TO RELATIVE <br />COMPACTION OF 95% TO A DEPTH OF SIX INCHES. <br />CONTRACTORS NOTES: <br />1.THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, BARRICADES, <br />SIGNS, FLAGMEN OR OTHER DEVICES NECESSARY FOR <br />PUBLIC SAFETY IN ACCORDANCE WITH THE CURRENT ISSUE <br />OF THE "CALIFORNIA MANUAL OF UNIFORM TRAFFIC CONTROL <br />DEVICES". <br />2.THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY <br />FIELD CHANGES MADE WITHOUT PRIOR WRITTEN <br />AUTHORIZATION FROM THE OWNER AND THE ENGINEER. <br />3.THE CONTRACTOR SHALL MAINTAIN A NEATLY MARKED SET <br />OF FULL-SIZE AS-BUILT RECORD DRAWINGS SHOWING THE <br />FINAL LOCATION AND LAYOUT OF ALL MECHANICAL; <br />ELECTRICAL AND INSTRUMENTATION EQUIPMENT PIPING AND <br />CONDUITS; STRUCTURES AND OTHER FACILITIES. THE <br />AS-BUILTS OF THE ELECTRICAL SYSTEM SHALL INCLUDE THE <br />STREET LIGHT LAYOUT PLAN SHOWING LOCATION OF LIGHTS, <br />CONDUITS, CONDUCTORS, POINTS OF CONNECTIONS TO <br />SERVICES, PULLBOXES, AND WIRE SIZES. AS-BUILT RECORD <br />DRAWINGS SHALL REFLECT CHANGE ORDERS, <br />ACCOMMODATIONS, AND ADJUSTMENTS TO ALL <br />IMPROVEMENTS CONSTRUCTED. WHERE NECESSARY, <br />SUPPLEMENTAL DRAWINGS SHALL BE PREPARED AND <br />SUBMITTED BY THE CONTRACTOR. <br />4.PRIOR TO ACCEPTANCE, OF THE PROJECT, THE CONTRACTOR <br />SHALL DELIVER TO THE ENGINEER, ONE SET OF NEATLY <br />MARKED AS-BUILT RECORD DRAWINGS SHOWING THE <br />INFORMATION REQUIRED ABOVE. AS-BUILT RECORD <br />DRAWINGS SHALL BE REVIEWED AND THE COMPLETE <br />AS-BUILT RECORD DRAWING SET SHALL BE CURRENT WITH <br />ALL CHANGES AND DEVIATIONS REDLINED AS A <br />PRECONDITION TO THE FINAL PROGRESS PAYMENT <br />APPROVAL AND/OR FINAL ACCEPTANCE. <br />5.IF CONTRACTOR DISTURBS ANY PROPERTY CORNERS OR <br />CENTERLINE MONUMENTS DURING THE DEMOLITION OR <br />CONSTRUCTION OF THE PROJECT, THE CONTRACTOR MUST <br />HIRE A REGISTERED LAND SURVEYOR TO RESET THE <br />MONUMENT PER THE PROFESSIONAL LAND SURVEYORS ACT <br />SECTION 8771. <br />6.CONTRACTOR SHALL FIELD VERIFY ALL SIZES, ELEVATIONS, <br />FLOW DIRECTION, AND PROXIMITY OF UNDERGROUND <br />UTILITIES PRIOR TO COMMENCING PIPE REPLACEMENT <br />CONSTRUCTION. CONTRACTOR SHALL CONTACT ENGINEER IF <br />ANY DISCREPANCIES ARE FOUND IN FIELD PRIOR TO <br />COMMENCING WORK. <br />7.PRIOR TO THE START OF CONSTRUCTION THE CONTRACTOR <br />SHALL VIDEO RECORD THE EXISTING CONDITIONS TO <br />DETERMINE ANY POTENTIAL CONFLICTS SUCH AS PIPE <br />CROSSINGS, PIPE CONFLICTS, SERVICE LATERALS OR <br />NEARBY UTILITIES THAT MAY INTERFERE WITH THE PIPE <br />TRENCHING AND REPLACEMENT PROCESS. ONCE <br />CONSTRUCTION IS FINISHED PROVIDE SJC GENERAL <br />SERVICES WITH THE PIPE VIDEO. <br />8.CONTRACTOR SHALL REPLACE ANY ITEMS IN KIND THAT ARE <br />DAMAGED DURING CONSTRUCTION. <br />9.THE CONTRACTOR SHALL USE EXTREME CAUTION WHEN <br />EXPOSING EXISTING UTILITY CROSSING AND SERVICES. <br />10.CONTRACTOR SHALL VERIFY HORIZONTAL AND VERTICAL <br />LOCATIONS OF ALL EXISTING UTILITIES. <br />11.CONTRACTOR SHALL USE NON-SKID PLATES TO COVER OPEN <br />TRENCHES. PLATES TO BE PINNED PER SPECIFICATIONS. <br />12.IF THE CONTRACTOR CUTS THE LID OF ANY SANITARY SEWER <br />MAINTENANCE STRUCTURE FOR ACCESS, THE CONTRACTOR <br />SHALL REPLACE THE LID IN KIND. <br />13.AT LEAST 1 MONTH PRIOR TO WORKING IN PUBLIC UTILITY <br />EASEMENT AREAS, THE CONTRACTOR SHALL COORDINATE <br />WITH AFFECTED PROPERTY OWNERS TO REQUEST AND <br />OBTAIN ACCESS TO EASEMENT FOR EQUIPMENT AND <br />WORKERS AS NECESSARY TO COMPLETE WORK. <br />SURFACE IMPROVEMENTS NOTES: <br />1.SEWER LINE TRENCH CONSTRUCTION AND RESURFACING SHALL <br />BE IN ACCORDANCE WITH SAN JOAQUIN COUNTY STANDARD <br />DWG. NO. R-29. <br />NPDES NOTES: <br />1.DUST CONTROL SHALL BE PROVIDED AT ALL TIMES, AT THE <br />CONTRACTOR'S EXPENSE, TO MINIMIZE ANY DUST NUISANCE <br />AND SHALL BE IN ACCORDANCE WITH SECTION 10 OF <br />CALTRANS STANDARD SPECIFICATIONS AND THE <br />REQUIREMENTS OF THE COUNTY OF SAN JOAQUIN. <br />2.ANY AND ALL SEDIMENT AND/OR EROSION CONTROL DETAILS <br />CONTAINED WITHIN THESE PLANS ARE TO BE CONSIDERED AS <br />"REFERENCE DETAILS" ONLY AND THE COUNTY'S APPROVAL <br />OF THESE PLANS AND "REFERENCE DETAILS" DOES NOT <br />RELIEVE THE OWNER FROM COMPLIANCE WITH THE STORM <br />WATER POLLUTION PREVENTION PLAN (SWPPP) AS APPROVED <br />BY THE COUNTY'S STORMWATER DIVISION. <br />3.THE CONTRACTOR SHALL FURNISH, INSTALL, OPERATE AND <br />MAINTAIN ALL EXCAVATIONS FREE FROM WATER DURING <br />CONSTRUCTION, AND SHALL DEWATER AND DISPOSE OF THE <br />WATER SO AS TO NOT CAUSE INJURY TO PUBLIC OR PRIVATE <br />PROPERTY OR TO CAUSE A NUISANCE OR MENACE TO THE <br />PUBLIC. THE DEWATERING SYSTEM SHALL BE INSTALLED AND <br />OPERATED SO THE GROUNDWATER LEVEL OUTSIDE THE <br />EXCAVATION IS NOT REDUCED TO THE EXTENT WHICH WOULD <br />CAUSE DAMAGE OR ENDANGER ADJACENT STRUCTURES OR <br />PROPERTY. ALL COSTS FOR DEWATERING SHALL BE <br />INCLUDED IN THE UNIT PRICE BID FOR ALL PIPE <br />CONSTRUCTION. THE STATIC WATER LEVEL SHALL BE DRAWN <br />DOWN A MINIMUM OF 1 FOOT BELOW THE BOTTOM OF <br />EXCAVATION TO MAINTAIN THE UNDISTURBED STATE OF <br />NATURAL SOILS AND ALLOW THE PLACEMENT OF ANY FILL TO <br />SPECIFIED DENSITY. DISPOSAL OF WATER SHALL BE IN <br />ACCORDANCE WITH THE APPROVED SWPPP AND SHALL NOT <br />DAMAGE PROPERTY, CREATE NUISANCE OR VIOLATE THE <br />LAW. THE CONTRACTOR SHALL HAVE WORKMEN AVAILABLE <br />FOR ITS OPERATION. THE DEWATERING SYSTEM SHALL <br />OPERATE CONTINUOUSLY UNTIL BACKFILL HAS BEEN <br />COMPLETED TO 1 FOOT ABOVE. THE NORMAL STATIC <br />GROUNDWATER LEVEL. <br />4.LOCATION OF SAW CUTTING SHALL BE DETERMINED IN THE <br />FIELD WITH THE COUNTY INSPECTOR. IF THE EXISTING <br />SECTION REQUIRES GRINDING OR OVERLAYING OF AC, IT <br />SHALL BE DETERMINED IN THE FIELD WITH THE COUNTY <br />INSPECTOR. <br />5.INSERTION OF THE NEW PIPE, THE CONTRACTOR SHALL <br />EXPEDITE THE RECONNECTION OF SERVICES SO AS TO <br />MINIMIZE ANY INCONVENIENCE TO THE CUSTOMERS. <br />BY-PASS PUMPING NOTES: <br />1.IF A BYPASS PUMP PLAN IS REQUIRED BY THE COUNTY. THE <br />CONTRACTOR SHALL BE RESPONSIBLE FOR PLAN. tHE BYPASS <br />PUMP PLAN SHALL BE SUBMITTED TO THE COUNTY NO LESS <br />THAN 72 HOURS IN ADVANCE OF BYPASS PUMPING AND SHALL <br />BE APPROVED BY THE COUNTY PRIOR TO BYPASS PUMPING. <br />THE CONTRACTOR, WHEN AND WHERE REQUIRED, SHALL <br />PROVIDE DIVERSION FOR THE PIPE REPLACEMENT PROCESS. <br />THE PUMPS AND BY-PASS LINES SHALL BE OF ADEQUATE <br />CAPACITY AND SIZE TO HANDLE ALL FLOWS. <br />2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTINUITY <br />OF SANITARY SEWER SERVICE TO EACH FACILITY CONNECTED <br />TO THE SECTION OF SEWER DURING THE EXECUTION OF THE <br />WORK. <br />3.IF SEWAGE BACKUP OCCURS AND ENTERS BUILDINGS, THE <br />CONTRACTOR SHALL BE RESPONSIBLE FOR CLEAN-UP, <br />REPAIR, PROPERTY DAMAGE COST AND CLAIMS. <br />5.THE DESIGN, INSTALLATION, AND OPERATION OF THE <br />TEMPORARY BYPASS PUMPING SYSTEM SHALL BE THE <br />CONTRACTOR'S RESPONSIBILITY. <br />6.CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, <br />SUPERVISION, AND MATERIALS NECESSARY TO <br />REDUCE/CONTROL FLOWS VIA SEWAGE FLOW MECHANISMS <br />OR ELIMINATE FLOWS VIA BYPASS PUMPING THROUGH A <br />SECTION OR SECTIONS OF PIPE DESIGNATED FOR <br />INSPECTION AND/OR REHABILITATION. ALL SEWER BYPASS <br />SHALL BE PROVIDED AT CONTRACTOR'S EXPENSE. <br />7.CONTRACTOR SHALL BE RESPONSIBLE FOR CONTROLLING <br />AND MAINTAINING ALL FLOWS WITHIN THE SEWER SYSTEM <br />DURING WORK. CONTRACTOR MAY DRAIN FLOWS BY PIPE <br />CHASES, FLUMING, BYPASS PUMPING, OR OTHER <br />APPROPRIATE METHODS APPROVED BY THE OWNER AND <br />ENGINEER. <br />8.PLUGGING OF ANY SEWER LINE WITHOUT BYPASSING SHALL <br />NOT BE PERMITTED. <br />9.PRECAUTIONS SHALL BE TAKEN TO ENSURE THAT FLOW <br />CONTROL AND DEWATERING OPERATIONS SHALL NOT CAUSE <br />FLOODING OR DAMAGE TO PUBLIC OR PRIVATE PROPERTIES. <br />IN THE EVENT FLOODING OR DAMAGE OCCURS, CONTRACTOR <br />SHALL MAKE PROVISIONS TO CORRECT SUCH DAMAGE AT NO <br />ADDITIONAL COST TO OWNER. <br />10.CONTRACTOR SHALL PLAN AND EXECUTE BYPASS PUMPING <br />SUCH THAT NO SEWER SERVICES ARE INTERRUPTED OR <br />AFFECTED IN ANY WAY. NO INTERRUPTION OR LOSS OF <br />SEWER SERVICE IS ACCEPTABLE. <br />11.THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ADEQUATE <br />PUMPING EQUIPMENT, FORCE MAINS, AND OTHER <br />NECESSARY APPURTENANCES IN ORDER TO MAINTAIN <br />RELIABLE SANITARY SEWER SERVICE IN ALL SANITARY SEWER <br />LINES WITH THE POTENTIAL TO BE AFFECTED BY THE WORK. <br />CONTRACTOR TO HAVE BACKUP PUMPS AND <br />APPURTENANCES ON-SITE READY TO DEPLOY IMMEDIATELY. <br />12.ALL PIPING, JOINTS, AND ACCESSORIES SHALL BE DESIGNED <br />TO WITHSTAND AT LEAST TWICE THE MAXIMUM SYSTEM <br />PRESSURE, OR A MINIMUM OF 50 PSI, WHICHEVER IS <br />GREATER. <br />REVISIONS <br />DateNo.Description <br />Job No. <br />Date <br />Drawn by <br />Proj Mgr AKM <br />19186 <br />5OF: <br />PROJECT <br />SHEET TITLE <br />SAN JOAQUIN <br />COUNTY MICKE <br />GROVE DELTA <br />SHELTER <br />SEPTIC <br />REPAIRS <br />11793 MICKE GROVE RD <br />LODI, CA 95240 <br />01/10/2022 <br />ARM <br />Know what's below. <br />before you dig.Call <br />R <br /> <br />SHEET: <br />3428 Brookside Road <br />Stockton,California 95219 <br />209-943-2021 <br />Fax: 209-942-0214 <br />www.siegfriedeng.com <br />CIVIL <br />STRUCTURAL <br />LANDSCAPE <br />ARCHITECTURE <br />SURVEYING <br />PLANNING <br />ATHLETIC <br />FACILITY DESIGN <br />9/27/21 T&S RFI #11