Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8 . SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum 9 Hydrostatic <br /> Test Equipment Used : .3ocnvs <br /> Sump/UDC IDt ` k <br /> Sump Manufacturer S r 'n s Cern ✓ Ft� <br /> Sump Depth ( inches) ( ' �6 ' r <br /> Sump Bottom to Top of <br /> rr <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time � ; ` ® . �� 10• t � ; 0 - <br /> Initial Reading • 0C r> % A%66 " r) <br /> Test End Time <br /> Final Reading % 006&0r' <br /> Change in Reading 00• 000c{ <br /> Pass/Fail Criteria ,pp -t /® t 6X1 ' ' .t / ® tltlu <br /> Tightness Test Results DR Pass ❑ Fail ® Pass ❑ Fail N Pass ❑ Fail Pass ❑ Fail <br /> Sump/UDC ID ut�G �� 1 vot <br /> Sump Manufacturer <br /> Sump Depth (inches) def '' �, t/ r � It � y ' I <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration loll-, a r <br /> (inches) <br /> Test Start Time ' <br /> Initial Reading kOtolb 4 1°1llor � <br /> Test End Time t'a rr, tl '• " 1 '. 5 \�.' 2l5 vw <br /> Final Reading <br /> Change in Reading (� U , p�S ° d 04 0003 "1 <br /> Pass/Fail Criteria �� aU� ii �� � n �/ x.00 y /® owo <br /> Tightness Test Results Pass ❑ Fail [& Pass ❑ Fail N Pass ❑ Fail EA Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail" and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />