Laserfiche WebLink
7) Check that all testing and maintenance has been completed and documented. 8) Verify that all facility <br />employees have been trained in accordance with 23 CCR 2715(c). 9) The owner/operator sign and date the <br />Designated Underground Storage Tank Operator Visual Inspection Report within 72 hours of being provided a <br />signed copy. OBSERVATION: The designated operator failed to check and note all required items on the visual <br />inspection reports. The incorrect and missing information included the following from the inspection reports: - <br />The DO reports of 11/1/2021, 9/3/2021, 8/6/2021, 5/22/2022, 4/22/22, 3/25/2022, 2/25/2022 and 1/28/2022 <br />did not include the owner/operator name, signature and date signed. -The DO reports of 12/31/2021, <br />12/01/2021, 10/03/2021, 07/08/2021 and 06/09/2021 did not include the owner/operator name. -The DO <br />report of 11/01/2021 did not include follow up actions in section 5 to compliance issues from section 3 <br />REGULATION GUIDANCE: During the visual inspection, the designated operator shall check that all required <br />testing and maintenance for the UST system have been completed and shall check all required items on the <br />report. <br />Corrective Action <br />Ensure that designated operators performing visual inspections at this facility are including all the required <br />information on the reports <br />Response <br />RTC form was signed and submitted 6/02/2022 — see attachments Fast Easy Mart 103 RTC & corrective action <br />060222 (page 3) and Fast Easy Mart 103 DO visual inspection report 060921-052222. Designated operator has <br />been instructed to fully complete all required information on the reports, and facility operator will check and <br />sign reports going forward. <br />Violation #214 <br />Failure to comply with any of the applicable requirements of the permit issued for the operation of the UST <br />system. OBSERVATION: The facility is not in compliance with the written conditions of the operating permit. <br />The overfill prevention equipment testing due by 10/2021 has not been conducted. REGULATION GUIDANCE: <br />The owner and operator of underground storage tank (UST) systems shall comply with all requirements of the <br />permit issued for the operation of the UST system. <br />Corrective Action <br />Immediately take all necessary actions to bring these UST systems into compliance. Schedule for overfill <br />prevention equipment testing now. <br />Response <br />RTC form was signed and submitted 6/02/2022 — see attachments Fast Easy Mart 103 RTC & corrective action <br />060222 (page 4) and Fast Easy Mart Stockton Full OPEI Report 2021-10-19. Next inspection is due by <br />10/19/2024 and will be conducted prior to that date with OPEI Report forwarded to CUPA when received. <br />Violation #209 <br />Failure to maintain a copy of the "Facility Employee Training Certificate" on-site or off-site at a readily <br />available location, if approved by the UPA. <br />Corrective Action <br />Update the Facility Employee Training Certificate to contain the accurate information and submit a copy of the <br />updated form to the EHD. <br />