Laserfiche WebLink
15 <br />f d <br />1 2. Title 27 CCR Section 20650 Grading of Fill Surfaces. Improper grading of fill surfaces. <br />2 <br />3 PURSUANT TO PRC SECTIONS 45000 and 45005 ENVIRONMENTAL FILTRATION <br />4 TRUST ARE ORDERED TO TAKE THE FOLLOWING CORRECTIVE ACTION: <br />5 <br />1. Provide perimeter fence to prevent unauthorized access and the illegal disposal of soli <br />6 waste at the property in question. <br />7 <br />2. Submit to this office, for review and approval, a corrective action plan for site <br />8 remediation. The plan will require approval by the CIWMB and the Regional Water <br />9 Quality Control Board. <br />10 3 • The contents of the corrective action plan shall include, but not be limited to: <br />a site health and safety plan, a scope of work, work -plan, the identification of the <br />11 contractor performing the remediation, the schedule for remediation, a plan for handling <br />and disposal of any household hazardous wastes and/ or hazardous wastes should they <br />12 be discovered, and a final site drainage and erosion control plan. Material suitable for <br />13 recycling shall be recycled at an appropriate recycle facility. COPIES OF ALL <br />DISPOSAL RECEIPTS SHALL BE PROVIDED TO THIS DEPARTMENT. <br />14 <br />4. Remediate the site in accordance with the approved corrective action plan. <br />15 <br />16 COMPLIANCE SCHEDULE: <br />17 <br />Item No. 1: Ensure the existing fence is maintained to prohibit trespassing and illegal disposal <br />19 of refuse. Add additional No Trespassing' signs at appropriate locations. Instal <br />19 perimeter fence within 60 days of receipt of this order. <br />20 Item No. 2: Within one hundred twenty (120) days of receipt of this order submit the <br />corrective action plan. The LEA will either approve or deny the . corrective <br />21 actions plan within one hundred twenty (120) days of submittal. <br />22 Item No. 3: Site remediation shall commence within ninety (90) days of plan approval. <br />23 Complete the remediation of the site in conformance with the approved corrective <br />action plan within ninety (90) days of plan approval. Provide copies of disposal <br />24 receipts to the LEA on a weekly basis until project completion. <br />25 <br />THEREFORE, PLEASE TAKE NOTICE THAT PURSUANT TO PRC SECTIONS 45000, <br />26 <br />45011, AND 45014, if the above actions are not completed or complied with by the specified dates, <br />27 <br />the CIWMB may: <br />-3- <br />