Laserfiche WebLink
SAN J 0 A Q I I I Irl Environmental Health Department <br /> CCUNTY <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> SJ CO PUBLIC WORKS CORP YARD* 1810 E HAZELTON AVE, STOCKTON March 21, 2022 <br /> Other Violations <br /> 2010 See below Unlisted General violation ❑V ❑R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 122 CCR 2712(f)Failure to implement corrections and submit written response within 30 days of receiving the report. <br /> OBSERVATION:An inspection was last done on 3/26/21 and an inspection report was issued identifying information <br /> to be submitted to bring this site into compliance. This information was required to be submitted by 4/25/21 and was <br /> not received until 2/9/22. <br /> REGULATION GUIDANCE:An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions. The corrective action shall include <br /> all of the recommendations made in the report. The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> This is a repeat violation, Class II. <br /> 208 CCR 2716(a-e) Failure to comply with the designated operator inspection requirements. <br /> OBSERVATION: The designated operator failed to check and note all required items on the visual inspection <br /> reports.The incorrect and missing information included the following from the inspection reports: <br /> -An incorrect overfill prevention equipment inspection date was listed. <br /> -The 7/1/21 fuel alarm was not addressed in the report. <br /> -The owner/operator signature on the 12/3/21 report was dated 12/1/21,two days prior to the inspection being <br /> conducted. <br /> REGULATION GUIDANCE: During the visual inspection,the designated operator shall check that all required <br /> testing and maintenance for the UST system have been completed and shall check all required items on the report. <br /> CORRECTIVE ACTION: Ensure that designated operators performing visual inspections at this facility are including <br /> all of the required information on the reports. <br /> This is a repeat violation, Class II. <br /> Overall Inspection Comments: <br /> An inspection checklist was provided to the facility operator on the day of inspection. A complete report was <br /> finished on 4/7/22 and replaces the initial checklist. <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, within 30 days of receiving the complete inspection report. <br /> FA0003954 PR0231141 SCO01 03/21/2022 <br /> EHD 23-01 Rev.12/06/2021 Page 4 of 5 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />