Laserfiche WebLink
SWRCB, January 2006 <br />Spill Bucket Testing Report Form <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />Facility Name: 7 -Eleven 441341 Date of Testing: 6/2/2022 <br />Facility Address: 4405 Pacific Ave , Stockton, CA 95207 <br />Facility Contact: Phone: - <br />Date Local Agency Was Notified of Testing: 5/25/2022 <br />Name of Local Agency Inspector (if present during testing): John Alaniz <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: TANKNOLOGY INC. <br />Technician Conducting Test: Jesus Saldivar <br />Credentials l: r CSLB Contractor rv— ICC Service Tech. r SWRCB Tank Tester r Other (Specify) <br />License Number(s): <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used By: r— Hydrostatic W Vacuum F Other <br />Test Equipment Used: VACUUM TEST <br />Equipment Resolution: 0.1 gph <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc) <br />Spill Box # Tank T-1 RUL <br />REG UNLEAD - Fill 1- <br />Direct - Grade level <br />Spill Box # Tank T-2 PUL <br />PREMIUM - Fill 1 - Direct - <br />Grade level <br />Spill Box # <br />Spill Box # <br />Bucket Installation Type: <br />C: Direct Bury <br />r Contained in Sump <br />C Direct Bury <br />C Contained in Sump <br />r Direct Bury <br />r Contained in Sump <br />C Direct Bury <br />C Contained in Sump <br />Bucket Diameter: <br />12.00 <br />12.00 <br />Bucket Depth: <br />14.00 <br />14.00 <br />Wait time between applying <br />vacuum/water and start of test <br />5 min <br />5 min <br />min <br />min <br />Test Start Time (TI): <br />08:40:00 <br />08:42:00 <br />Initial Reading (RI): <br />30.00 in. 1420 <br />30.00 in. H2O <br />Test End Time(TF): <br />08:41:00 <br />08:43:00 <br />Final Reading (RF): <br />30.00 in. H2O <br />29.00 in. H2O <br />Test Duration(TF—TI): <br />1 min <br />1 min <br />Change in Reading (RF—RI) : <br />0.00 in. H2O <br />-1.00 in. H2O <br />Pass/Fail Threshold or Criteria: <br />+/-4.00 <br />+/-4.00 <br />+/- <br />+/- <br />Test Result: <br />Pass <br />Pass <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature: All <br />Date: 6/2/2022 <br />'State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements may be more stringent. <br />WO: 2355594 <br />