My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
4405
>
2300 - Underground Storage Tank Program
>
PR0508452
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2022 10:37:51 AM
Creation date
3/3/2022 9:53:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0508452
PE
2361
FACILITY_ID
FA0007787
FACILITY_NAME
7-ELEVEN INC #41341
STREET_NUMBER
4405
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
11024013
CURRENT_STATUS
01
SITE_LOCATION
4405 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tanknology <br />Emergency Stop (E -Stop / ESO) Periodic Inspection <br />Facility Information <br />Technician Information <br />Site #: 7 -Eleven #41341 41341 <br />Date: 6/2/2022 <br />Address: 4405 Pacific Ave <br />Name: Jesus Saldivar <br />City / State: Stockton CA4i1 <br />Technician Signature: <br />The objective of this test is to provide assurance that the when the E -Stop switch is activated, all the fueling system circuits (turbines, and <br />dispensers) are de -energized, and remain de -energized until they are re -set manually). The test procedures and guidelines shall be in accordance <br />with the E -Stop Testing Process. <br />SITE DATA <br />1 <br />Number of E -Stop switches INSIDE of the building: <br />1 <br />2 <br />Number of E -Stop switches OUTSIDE of the building: <br />1 <br />PERFORMANCE DATA <br />Yes <br />No <br />NA <br />3 <br />You have added or confirmed that all E -Stop locations are on the Site Diagram <br />4 <br />Do all E -Stops shutdown power to ALL DISPENSERS <br />C+ <br />C <br />5 <br />Do all E -Stops shutdown power to ALL STP's <br />f <br />C <br />6 <br />Are ALL E -Stops clearly Labeled <br />t <br />f <br />7 <br />Are the TURBINE BREAKERS clearly identified / labeled <br />C+ <br />t <br />POST TEST <br />8 <br />All equipment secured and any access ports, lids, enclosures are closed. <br />f <br />C <br />9 <br />All safety barricades and test equipment has been properly removed <br />( <br />f <br />10 <br />E -Stop was reset and all dispensing functions are normal <br />r <br />E -Stop Inspection Results <br />11 <br />PASS I FAIL I INCONCLUSIVE <br />Comments (Clearly describe any deficiencies found) <br />WO: 2355594 <br />
The URL can be used to link to this page
Your browser does not support the video tag.