My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
REYNOLDS RANCH
>
2680
>
2300 - Underground Storage Tank Program
>
PR0535432
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2022 11:23:22 AM
Creation date
3/3/2022 10:28:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0535432
PE
2351
FACILITY_ID
FA0020431
FACILITY_NAME
COSTCO WHOLESALE #1091
STREET_NUMBER
2680
STREET_NAME
REYNOLDS RANCH
STREET_TYPE
PKWY
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
2680 REYNOLDS RANCH PKWY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�� <br /> 'vFranklinFuelingSystems I UNDERGROUND STORAGETANK EQUIPMENT ITEM # 1- - - - - - <br /> C <br /> I <br /> DEFENDER SERIESTM OVERFILL <br /> PREVENTION VALVE <br /> The Defender Series'" overfill prevention valve (OPV) is a self-contained <br /> two-stage positive shut-off valve that prevents the overfill of an underground <br /> storage tank ( UST) during a gravity-fed product delivery. The Defender Series'" <br /> I OPV employs a revolutionary magnetically-coupled actuator system to provide <br /> positive shut-off. This unique method of shut-off eliminates any penetrations <br /> in the valve, making it both vapor- and leak-tight . The Defender Series" OPV <br /> provides safe , rapid , and reliable fuel drops for the broadest range of fuel <br /> _ applications and environmental conditions . Simple to install , service, and test <br /> remotely, the Defender Series'" OPV is the industry 's most versatile overfill <br /> prevention valve . <br /> Top Adapter <br /> . . SpecificationsD <br /> • Magnetic coupler actuates the interior primary flapper Approvals/Certifications <br /> assembly and secondary shut-off valve when the float . ULc listed . NW Q ' 5 2021 <br /> rises outside of the valve , eliminating valve body <br /> penetrations and any potential product or vapor • ATEX approved . <br /> leak points . . CARIB certified . ENVIRONMENTAL HEALTH <br /> • After cutting to length in the field , the upper drop tube Dimensions DEPARTMENT <br /> is roll-crimped onto a top adapter outfitted with two <br /> 0-rings and then threaded onto the top of the valve s.s7 <br /> body, eliminating the need for drilling , rivets , epoxy, (101 mm) <br /> and flaring tools . <br /> 1.75' <br /> • Bottom drop tube is cut in the field and threaded onto (44.5 mm) <br /> the bottom of the valve ensuring straight installation . 95 % <br /> • The roll-crimp/thread method of installing drop tubes shutoff <br /> Level <br /> ensures proper alignment of the drop tubes with the <br /> rest of the OPV assembly, making installation and <br /> removal of the entire assembly smooth . 117 <br /> • Damaged drop tubes can be easily replaced instead of <br /> having to purchase an entire new assembly. <br /> • Fully compatible with gas , gas/alcohol blends , diesel , <br /> 1 <br /> and Biodiesel . 7 m <br /> (4422 m mm) (4667 mm) <br /> • Compatible with industry standard 4° drop tubes <br /> allowing retrofit into existing installations . <br /> • The entire OPV assembly remains within the 4' inner <br /> diameter of the riser preventing interference with other <br /> tank components and also allowing removal even while <br /> the tank is full . <br /> • Actuates in both low- and high-flow applications and = <br /> functions within a broad range of flow rates from <br /> 25 gpm to 370 gpm (95 Ipm to 1 , 400 Ipm) and higher. <br /> • The remote testing tool allows for remote testing of the <br /> primary functionality without having to remove the OPV <br /> from the riser. n'1, <br /> �EQW <br /> SERVICE STATION HARDWARE 95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.