My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014699
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRANSPORTATION
>
110
>
2600 - Land Use Program
>
PA-2100271
>
SU0014699
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2022 2:05:53 PM
Creation date
3/4/2022 2:21:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014699
PE
2632
FACILITY_NAME
PA-2100271
STREET_NUMBER
110
Direction
E
STREET_NAME
TRANSPORTATION
STREET_TYPE
CT
City
FRENCH CAMP
Zip
95231-
APN
19327022
ENTERED_DATE
12/28/2021 12:00:00 AM
SITE_LOCATION
110 E TRANSPORTATION CT
RECEIVED_DATE
7/11/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and Plnn Review Team PcePmnan�ne.�osn.�m <br /> S <br /> E/ectric Company �a�e Man�mam <br /> March 31,2022 <br /> Giuseppe Sanfilippo <br /> County of San Joaquin <br /> 181 O E Hazelton Ave <br /> Stockton, CA 95205 <br /> Ae: PA-2100271 <br /> 11 O Transportation Court, French Camp, CA 95231 <br /> Dear Giuseppe: <br /> Thank you for giving us the opportunity [o review the subject plans. The proposed PA-2100271 <br /> is within the same vicinity of PGRcE's existing facilities that impact this property. <br /> PGRE currently has existing underground gas and electric service facilities installed within the <br /> initial 1 O' feet of the frontage of APN: 193-270-22, along E Transportation Court. The applicant <br /> is proposing sanitary sewer and water line improvements within proximity to the existing PG$E <br /> service facilities. When crossing either of PGBcE's service lines with other utilities,a minimum <br /> of B' inches vertical clearance must be maintained between PGBcE's service facilities and the <br /> other utilities. PGBLE requests that all utilities cross under PGBcE's existing service facilities. <br /> Additionally,multiple sanitary sewer lines aro proposed to parallel PG.4cE's service facilities. <br /> The parallel sanitary sewer lines must maintain a minimum of 3' feet horizontal clearance from <br /> the gas line and a minimum 1' Foot horizontal clearance from the underground electric line. Any <br /> fire hydrants installed must also maintain the same horizontal clearances from the PGCE service <br /> facilities. <br /> Please contact the Building and Renovation Center(BRSC)for facility map requests by calling <br /> 1-877-743-7782 and PGRcE's Service Planning department at www.oee.com/eco for any <br /> modiFcation or relocation requests, or for any additional services you may require. <br /> As a reminder,before any digging or excavation occurs,please contact Underground Service <br /> Alert(USA)by dialing 81 1 a minimum of 2 working days prior to commencing any work. This <br /> free and independent service will ensure that all existing.underground utilities are identified and <br /> marked on-site. <br /> If you have any questions regarding our response, please contact me at Justin.Newell cC7r.oee.com. <br /> Sincerely, <br /> Justin Newell <br /> Land Management <br /> 9]6-5944068 <br /> PGBLE Gas and Electric Facilities Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.