Laserfiche WebLink
SJVUAPCD Indirect Source Review sit sizz <br /> Complete Project Summary Sheet 8r s:zz am <br /> Monitoring and Reporting Schedule <br /> (District Enfomatl Emission Reduction Measures Continued) <br /> Enforcing Agency Measure Specific Implamantation Maasura For DiatNct Ravlaw <br /> Com Iianca <br /> SJVAPCD Construction and For each project phase, <br /> Operational Dates maintain records of(t)the (Compliance Dept. <br /> construction start and entl Review) <br /> tlatas and(z)the date of <br /> issuance of the first certificate <br /> of occu enc if a licable. <br /> SJVAPCD Construction and For each project phase, all <br /> Operation-Racordkeepin9 records shall be maintained (Compliance Dept. <br /> on site during wnstructicn Review) <br /> and for a period of ten years <br /> following either the entl oP <br /> construction orthe issuance <br /> of the first certificate of <br /> occupancy,whichever is later. <br /> Records shall ba matle <br /> available for District <br /> ins action u on re uest. <br /> SJVAPCD Install Electric Vehicle Install electric vehicle <br /> (EV)Chargers chargers with t outlets total (Compliance Dep[. <br /> Revia <br /> SJVAPCD Landscape equipment 3 h Lantlscape Equipment <br /> electrically powaratl (Compliance Dapt. <br /> Review <br /> Number of District Enforced Measures: 5 <br /> 2 <br />