Laserfiche WebLink
I-4. Single Phases �avelopment <br /> Start of Consvuction(Month/Year):92022 Gross Acres:9.08 <br /> End of Construction(Month/Year):3rL023 Nei Acres(aroa devoted to buildings/structures): 2.13 <br /> First Date of Occupation(Mon[h/Year):3/2023 Paved Parking Area(#of Spaces):91 <br /> Building Square Footage: 12362 Number o£Dwelling Units:O <br /> J. On-Site Air Pollution Reduotions (Mitigation Measures) <br /> Listed below are categories of possible mitigation measures that will reduce a project's impact on air quality. If a category is <br /> applicable to dre pr jecq check"Vas",antl please complete the corresponding page to identify speciFc mitigation measures within <br /> that category. If a category is not applicable m the project,check"No"and provide justiPcation£or not selecting the measure(s). <br /> 1. Construction Clean Fleet(making a commitment to using a construction fleet chat will achieve the emission reductions requirod by <br /> Disvict Rule 9510) <br /> ® Yes,please complet¢mttlgn[ion measan-e 1 <br /> Q No,pleose provideJust�cation: <br /> 2. Land Use/Locetion (e.g.increased density,improv¢walkability design,increase transit,.etc.) <br /> O Ves,please comp/ate applicable mitigation measures 2v through 2f <br /> ® No,please providej�stiTmriomNot Applicable the are is rz res/ <br /> 3. Neighborhood/Site Enhancements(e.g.improve pedestriet mtwork,trafPc calming measures,NEV network,etc.) <br /> Q Yes,please complete applicable mitigation measures 3a through 3c <br /> ® No,please provideja+st�catton: Nm Apptfeable the are rat <br /> 4. Parking Pol:ry/Pric:ng(e.g.parking cost,on-street market pricing,Emit parking supply,etc.) <br /> � Yas, please complete app/icable mitigariau+neasure to through 4e <br /> ® No,please provide jvstifcation:All porXtng wt//be on rite. <br /> 5. Commute'itip Reduction Programs(e.g.workplace perking charge,employee vanpool/shuttle,ride sharing program,etc.) <br /> 0 Yes,please complate app/icable mtttgalfon measzmes Sa through Sf <br /> ® No,please provide justihcatios.: Not Applicable fhe ore is rurd <br /> 6. Building Design(e.g.woodswves or flreplacas) <br /> Ves,please c mp/ete mitigation measarre 6 <br /> ® No,pleose provide jzzr[ification:No woodstoves or fzrep/aces wttl be port phis project. <br /> ']. Building Energy(e.g.exaeetl title 24,electrical maintenance equipment) <br /> ® Yes,please comp/ate applicable mitigation measw-es 90 through]b <br /> Q No,please providejvst�catiosr: <br /> 8. Solar Panels(e.g.incoRorate solar panels in the p fact) <br /> Q Yas,pleose complete app/icable mstigotton measame 8 <br /> ® No,pleose provide justification:Solor pane/s are not imclvded in this project. <br /> 9.Electric Vehicle(EV)Charger(e.g.incorporate EV chargers)in the project) <br /> ® Ves,ptense comp/ate applicable mitigation mcasvre 9 <br /> Q No,please provide jvs[{fcotton: <br /> K. R®view Period <br /> You may request a five(5)day periotl m rev a drag o£[he District's analysis of your project be{r'e i[is finalized. However, if you <br /> choose[his option,i[west delay the pr ject's finalization by fives(5)business days. <br /> Q I requ¢st to r¢view a draft of[h¢District's analysis. <br /> Central Region Office: '1 BBO E.Gettysburg Av¢.Fresno,CA 93926-0244 TEL(SS9)2306000 FAX(5b8)230-606'1 N/EB www-vallevalr ora <br /> Page 3 of 12 ResltlenOal/Non-Rasitlentlal/Mlxetl-Us¢Appllcatlon Form Revls¢d Febmary 3,2022 <br />