Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer D Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum 0 Hydrostatic <br /> Test Equipment Used: Incon Tester <br /> Sump/UDC ID 87 STP 91 STP 87 FILL 91 FILL <br /> Sump Manufacturer Fiberglass Fiberglass Fiberglass Fiberglass <br /> Sump Depth (inches) 64" 64" 64" 64" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 21" 21" 32" 32" <br /> (inches) <br /> Test Start Time 9:39 am 11:29 am 9:39 am 9:39 am <br /> Initial Reading 5.4961 3.6256 3.6316 7.0612 <br /> Test End Time 9:54 am 11:44 am 9:54 am 9:54 am <br /> Final Reading 5.4957 3.6274 3.6310 7.0609 <br /> Change in Reading 0.0004 0.0018 0.0006 0.0003 <br /> Pass/Fail Criteria 0.002 0.002 0.002 0.002 <br /> Tightness Test Results p Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail <br /> Sump/UDC ID UDC 1/2 UDC 3/4 UDC 5/6 <br /> Sump Manufacturer Environ Environ Environ <br /> Sump Depth (inches) 31" 31" 31" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 16" 16" 16" <br /> (inches) <br /> Test Start Time 11:29 am 11:29 am 11:29 am <br /> Initial Reading 4.2953 4.0911 4.1276 <br /> Test End Time 11:44 am 11:44 am 11:44 am <br /> Final Reading 4.2749 4.0793 4.1188 <br /> Change in Reading 0.0204 0.0118 0.0088 <br /> Pass/Fail Criteria 0.002 0.002 0.002 <br /> Tightness Test Results ❑ Pass 0 Fail ❑ Pass El Fail ❑ Pass 0 Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />