Laserfiche WebLink
INTERNATIONAL PARK OF COMMERCE SPECIFIC PLAN•PHASE 2 JUNE 24, 2022 <br /> Promontory Parkway _ <br /> 3 I BLDG 2 <br /> a <br /> c I Waste Water <br /> Treatment Facility, <br /> =1 O y, <br /> I 0 0 � See Enlarged Plan <br /> I D 0 �, <br /> BLDG 1 <br /> I <br /> I BLDG <br /> -� S ------------ <br /> Schulte Road <br /> Legend <br /> ———— Tracy City Limits <br /> Sewer Main <br /> ■■■■■■■ Sewer Lateral <br /> Sewer Pump BLDG 4 <br /> 11 Waste Water Treatement and Sludge Drying <br /> 12 Waste Water Equalization <br /> 13 Recylced Storage Tank <br /> I <br /> } � e <br /> �X I <br /> K 12 <br /> 1 1 BLDG 5 <br /> X � <br /> Waste Water Service Facility Enlarged Plan <br /> O <br /> Figure 6.15 Waste Water Service Plan <br /> CHAPTER 6 <br /> 6-19 <br />