Laserfiche WebLink
INTERNATIONAL PARK OF COMMERCE SPECIFIC PLAN•PHASE 2 JUNE 24, 2022 <br /> I <br /> Promontory Parkway — <br /> y <br /> 7 AF <br /> 18 AF <br /> 31 BLDG 2 <br /> �I <br /> 01 <br /> M 0 8 wS� <br /> 00 0❑o` \ <br /> BLDG 1 <br /> 00 <br /> I <br /> BLDG 3 � <br /> A <br /> —� Schulte Road 8 AF <br /> Legend <br /> ———— Tracy City Limits <br /> I <br /> Detention Basins I� <br /> ® Treatment Basins } <br /> BLDG 4 <br /> Storm Drainage Main <br /> ----- Storm Drainage Lateral <br /> I1 <br /> 1 <br /> I <br /> BLDG 5 <br /> 1 <br /> Figure 6.17, Storm Drainage Plan <br /> CHAPTER 6 <br /> 6-21 <br />