Laserfiche WebLink
�� os/iZ/2oz� <br /> The following is an itemized list of underground storage tank violations that have not <br /> been addressed for AGS FUEL INC DBA CIRCLE K CHEVRON as of May 05, <br /> 2022. <br /> Open violations from March 30, 2022 inspection <br /> Violation #122-Failure to implement corrections and submit written response within 30 days of receiving <br /> the report. <br /> OBSERVATION: An inspection was last done on 0313012021 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance. This information was required to be submitted by <br /> 0412912021. This information was received on 912712021, five months late resulting in a non-compliant status for <br /> this facility. <br /> REGULATION GUIDANCE: An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions. The corrective action shall include <br /> all of the recommendations made in the report. The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken. <br /> CORRECTIVE ACTION: Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation:POP ' <br /> I <br /> Violation #208 -Failure to comply with the designated operator inspection requirements. <br /> OBSERVATION: The designated operator failed to check and note the correct test date for the overfill prevention <br /> on the designated operator inspection report of 03/07/2022. The incorrect date is 03/20/2021. The correct date for <br /> the overfill prevention testing is 03/30/2021. <br /> REGULATION GUIDANCE: During the inspection, the designated operator shall check that all required testing and <br /> maintenance for the UST system have been completed and document the dates they were done. <br /> CORRECTIVE ACTION: Ensure that designated operators performing inspections at this facility are including all of <br /> the required information on the reports. <br /> This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> r 1 <br /> Page 1 of 1 <br />