My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2526
>
2800 - Aboveground Petroleum Storage Program
>
PR0529691
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2022 3:55:03 PM
Creation date
3/22/2022 7:56:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0529691
PE
2832
FACILITY_ID
FA0010245
FACILITY_NAME
DTE STOCKTON LLC
STREET_NUMBER
2526
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2526 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2526 Washington Street PR0529691 <br /> March 16, 2022 Program: APSA <br /> PHOTO 1: PE certification not stamped. <br /> SPIII Prevention,Control,and Countermeasure Plan <br /> S 2.0 APPROVAL/CERTIFICATIONS <br /> V <br /> 2.1 Management Approval <br /> This SPCC Plan is to be implemented as herein described with full concurrence and <br /> commitment of DTE Stockton, LLC. All levels of management and operating personnel <br /> support the intent and procedures as set forth in this document. <br /> This approval extends to the commitment of manpower,equipment,and materials required <br /> to fully implement the SPCC Plan and to expeditiously control and remove any harmful <br /> quantity of oil that may be discharged to navigable waterways of the United States or <br /> F <br /> adjoining shorelines. <br /> Daniel H.Hildebrand <br /> Name Signature <br /> Plant Manager <br /> Title <br /> December 15 2017 <br /> Date <br /> 2.2 Professional Engineer's Certification Statement <br /> The undersigned Registered Professional Engineer (P.E.) is familiar with the <br /> requirements of Title 40 of the Code of Federal Regulations Part 112(40 CFR 112)and <br /> has examined or an agent of the P.E. has examined the Facility. The undersigned <br /> Registered Professional Engineer attests that this Spill Prevention, Control, and <br /> Countermeasures Plan (Plan) has been prepared in accordance with good engineering <br /> practices including applicable industry standards and in accordance with the <br /> requirements of 40 CFR 112; that procedures for required inspections and testing have <br /> been established;and that the Plan is adequate for the Facility. <br /> Ercan Canda ,PE <br /> Senior Project Manager <br /> California License No. C 72067 <br /> December 15 2017 <br /> Date <br /> This certification does not relieve the owner or operator of the Facility of its duty to prepare <br /> and implement the SPCC Plan in accordance with all applicable requirements. <br /> Lydia Baker, SR. REHS Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.