My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
244
>
2300 - Underground Storage Tank Program
>
PR0231137
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2022 9:36:41 AM
Creation date
3/22/2022 8:07:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231137
PE
2361
FACILITY_ID
FA0001554
FACILITY_NAME
MIRACLE MILE MARKET
STREET_NUMBER
244
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13708014
CURRENT_STATUS
01
SITE_LOCATION
244 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Monitoring System Certification Form <br />10. MONITORING SITE PLAN <br />Date site plan was prepared: <br />If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br />with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br />identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br />a legend for all symbols depicted. <br />Site Address: <br />. . . . . . . . . . . . . <br />. . . . . . . . . . . <br />UST Monitoring Site Plan <br />DELTA ARCO 440 W. CHARTER WAY STOCKTON CA 95210 <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . <br />. . . . . . . <br />. . . . . . . . . <br />. . . . . . . <br />Charter Way <br />................................................................. <br />.................................................... <br />.................................................... <br />.................................................... <br />....... <br />111 2 6. 5. . . .. . .. . . . <br />. . . . . . .. . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />.......... <br />. 10 x 9 <br />. . . . . . . <br />. . . . . . . .. <br />. . . . . . . . . <br />STORE.................................................... <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . <br />. . . . . . . <br />. . . . . . . . . <br />. . . . . . . . . <br />. . . . 3. x . . . . . . 8 x7. <br />.11 <br />TL5. <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />. . . . . . . <br />. . . . . . . <br />. . . . . . . . . <br />. . . . . . . . . <br />n <br />................................................ <br />C <br />................................................................. <br />D.......................... <br />..... <br />1 <br />n..xL <br />.... ........................... <br />( <br />. . . . . . . . . . . . <br />S.... <br />. . . . . . . . . . . <br />........................... <br />t............... <br />87 ..... .................. <br />. O <br />KEY <br />.................... <br />xL ........... <br />A=ANNULAR <br />. . . . . . . . . . <br />. . . . . . . . . . . . . . . . . . . <br />. . F = <br />FILLS <br />. . <br />. . . . . . . . . O . . . . . . . . <br />91 <br />. . . . T=TURBINE <br />*PIPING * . . <br />. . . . . . . . . . . . . . . . . . <br />. . P = <br />PROBE <br />Drawing ofpiping <br />... . . . . . . . <br />. . . . V = <br />VAPOR <br />exit of sump and . . <br />. . . . . . . . . <br />. . . . . . . ONA <br />. . X = <br />SUMP SENSOR <br />UDC's. No . <br />. . . . . . . . . . . . . . . . . . <br />. . . . L = <br />Leak Detector <br />underground . . <br />. . . . . . . . . <br />M = <br />Manway <br />drawing is . <br />, . , , , . . , . . A , , , , . , , . <br />. . , . B = <br />Brine Sensor <br />accurate, we , <br />, . , , , . . , . , <br />I— <br />Smart Sensor <br />cannot speculate <br />S = <br />STP <br />blue prints. <br />C = <br />Floats & Chains <br />CAR WASH <br />E = <br />E stop <br />_3 rr� rfave rrrrirgrmwdffue aia rete �isr6le fo rle carr��iireg rerlaeieiax cra a <br />�.rgfassrmrrl npirarnr arrrrrf<rs scda�rfar ir�nrrrnlxrmlprrrpc�_ Drmring <br />rivl fa :cde <br />8/25/20 <br />Instructions <br />If you already have a diagram that <br />shows all required information, you may include it, rather than this page, with your Monitoring <br />System Certification. <br />On your site plan, <br />show the general layout of tanks and <br />piping. Clearly identify locations of the following equipment, if installed: monitoring system <br />control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser <br />pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and <br />in -tank liquid level <br />probes (if used for leak detection). <br />In the space provided, note the date this Site Plan was prepared. <br />Monitoring System Certification <br />Page 4 of 4 <br />2/21/07 <br />Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.