Laserfiche WebLink
WALL FRMG PER PLAN(R) ROOF SHEATHING PER PLAN(R) TRUSS PER PLAN(E) BEAM PER PLANWALL FINISHAS OCCURS(R) H1 @EA TRUSSBN(R) 2X SHAPED BLKG W/ A35 EA BAY(E) RAFTER, REUSEBN(E) SHAPED BLKG FASTEN RAFTER TO TRUSS W/ (2) SDWS22300DB SCREWS(R) DRAG TRUSS PER PLAN W/ DROP CHORD, USE 2X8 MIN TOP CHORD, NOTCH FOR OUTLOOKER(N) 2X4 BLKG AT 24" OC @ BRACE W/ BN4-16d2x4 SLEEPER W/ BN(R) ROOF SHTG PERPLAN(N) A34 W/ SD#9 @ 32" OC(R) SOFFIT FRAMING IN LIKE KIND AND PER PLAN(R) WALL FRMG PER PLAN(R) SOFFIT FINISH TO MATCH (E)BN11(R) NOMINAL 3/8" SHTG FOR STUCCO BACKING(R) 2X4 LEDGER W/ 2-16D PER CONTACT2X4 PARAPETLUS24 HANGER FLIPPEDFACE NAIL SOFFIT FRAMING TO BLKGWALL FRMG PER PLANDBL TOP PL(N) H1 @ EACH TRUSS(R) TRUSS PER PLAN(R) ROOF SHEATHING PER PLANSP AS OCCURS2X4 BLKG(R) SOFFIT IN LIKE KIND(N) BN(N) 2X BLKG TO TOP PL, TYP BTWN EA TRUSS10'-0"BOT(R) 2X FLAT BLKG BTWN TRUSSES(R) ROOF SHEATHING PER PLAN(R) TRUSS PER PLANMATCH (E) PARAPET HEIGHTPRE-FABRICATED PARAPET, SEE TRUSS PROFILE ON S2.1(N) 4x6 BLKG (N) 2x4 BLKG W/ BN(R) 2x4 BLKG W/ BN2-16d PER CONTACT(R) CONTINUOUS HDR PER PLANRE-USE (E) STRAP (MIN CS16 STRAP)(E) WALL FRMG(E) BLKG(R) POST PER PLAN(R) WALL FRMG PER PLAN(R) ECC66 AND CC66 AS NEEDED(R) DBL KING STUD W/ A35 @ T&B(N) A35(E) GLULAM BEAM(N) ST6224 STRAP CENTERED FROM TOP PLATE TO GLULAMMECHANICAL UNIT AND CONNECTOR PER PLANMIN EMBED2"4X6 CURB(1) 3/8" LAG SCREW4x4 BLKG W/ LUS44 EA SIDE STAGR BLKG TO PREVENT FASTENER CLASHING(R) TRUSS PER PLANSHTG AND FINISHED ROOFINGDEGENKOLB ENGINEERS428 J ST, SUITE 500SACRAMENTO, CA 95814916.418.9100 (P)www.degenkolb.comSAN FRANCISCO LOS ANGELES OAKLAND SACRAMENTO SAN DIEGO SEATTLE TAHOEPETERILDASN NJ.No. 4901CUSCFOETREGRISREATSTEDTATAIEN G IN EERARL ROFIUNLExp. 6-30-23CTUURALRTS DATEDRAWNJOB NOSHEETREVISIONS:ProjectSheet TitleFile Path:C:\Users\kworcester\Documents\C1A84192.00-El Forastero_R20_kworcester.rvtC1A84192.00S4.1STRUCTURAL DETAILSEL FORASTERO MEXICAN FOOD1718 E. HAMMER LNSTOCKTON, CA 9521011/04/2021KLMDateDescription101/19/22Plan Check Response3/4" = 1'-0"2TRUSS EXTENSION3/4" = 1'-0"3FRONT SOFFIT3/4" = 1'-0"1TRUSS @ EXT WALL W/SOFFIT3/4" = 1'-0"4PARAPET CONNECTION3/4" = 1'-0"5WALL POST TO HDR3/4" = 1'-0"6MECHANICAL ANCHORAGE101/21/2022