Laserfiche WebLink
Baker, Lydia [END] <br />From: <br />Sent: <br />To: <br />Cc: <br />Subject: <br />Attachments: <br />Aric Morton <aricm@broadbentinc.com > <br />Monday, February 7, 2022 1:21 PM <br />Baker, Lydia [EHD] <br />Joey Cupp; Chip Hughes <br />FW: Spill-1501 N. Jack Tone Rd <br />IMG_9488.jpg; 665452561jpg; 665452603jpg <br />CAUTION: This email is originated from outside of the organization. Do not click links or open attachments unless you recognize the <br />sender and know the content is safe. <br />Ms. Baker, <br />Attached are photographs of the spill area after cleanup. The spill was tracked on both sides of the trench drain and it is <br />assumed that some fuel entered the drain. The majority of the fuel remained on the concrete/asphalt surface. The <br />trench drain is connected to the Site's OWS, but it is very difficult to determine or measure when a small volume enters <br />a 4,000 gallon OWS. I hope this information will address your request. Please do not hesitate to contact us further if <br />more information is required. <br />Cheers, <br />Aric <br />Aric Morton <br />Principal Geologist I Division Manager <br />m:530.518.3437 <br />aricm@broadbentinc.com <br />From: Chelsea Meddings <cmeddings@broadbentinc.com > <br />Sent: Tuesday, February 1, 2022 5:14 PM <br />To: Aric Morton <aricm@broadbentinc.com > <br />Subject: RE: Spill-1501 N. Jack Tone Rd <br />See attached. <br />Chelsea Meddings, QISP <br />Senior Staff Scientist <br />t:530.566.1400 I m:530.570.6755 <br />cmeddings@broadbentinc.com <br />From: Aric Morton <aricm@broadbentinc.com > <br />Sent: Tuesday, February 1, 2022 1:41 PM <br />To: Chelsea Meddings <cmeddings@broadbentinc.com > <br />Subject: FW: Spill-1501 N. Jack Tone Rd <br />Aric Morton <br />Principal Geologist I Division Manager