Laserfiche WebLink
UP <br />STUDIO <br />021 <br />X <br />STORAGE <br />018 <br />STUDIOI <br />F0221 I <br />I <br />D <br />CA <br />DANCE <br />STUDIO <br />STUDIO <br />023 <br />a <br />a <br />STUDIO <br />o2a <br />STUDIO <br />025 <br />(E) 4" SS <br />MECHANICAL <br />019 <br />i <br />3 <br />P22 <br />0 <br />SOUND <br />STUDIO <br />012 <br />SCREEN <br />El <br />DIGITAL <br />PI EDITING & <br />PRINTING --- <br />o1s I RECORDING <br />CONTROL; SOUND <br />ROOM STUDIO <br />Fo-1-31 014 <br />UUI <br />GALLON <br />GREASE INTERGEPTOR <br />\ FOR GREASE <br />— — INTERCEPTOR SIZING — — <br />CALCULATION REFER <br />TO SHEET P22. <br />PLUMF3NG F3�,SEMENT FLOOI-; PL�;N <br />SCALE: <br />—NORTH— <br />UP <br />ASSEMBLY <br />(NO WORK) <br />REFER TO PLUMBING <br />BASEMENT FLOOR PLAN <br />THIS SHEET FOR SEWER <br />COLD 4 HOT WATER $P.00. CONNECT (N) 2" VR SERVICES TO FIXTURES TO CEJ VTR <br />THIS AREA. 1/211 HV <br />WC -I WC -1 <br />11/2 Hy <br />TOILET <br />STORAGE STORAGE CONFERENCE <br />(NO WORK)(NO WORK) LAV -1 qy_ TOILET <br />W/ MV -1 w/ MV- 106 OOOM WORK) <br />STOR. <br />105 <br />_ (E) WOMEN <br />LIFT (NO WORK) <br />150 <br />6 <br />0 JAN. <br />(NO WORK) <br />ff <br />O COFFEE <br />ROASTING (E) MEN <br />® (NO WORK) <br />F <br />-NORTH- <br />PLUMBING GROUND FLOOR PLAN <br />NEW KEYNOTES SCHEDULE <br />OI (E) GAS METER APPROXIMATE ADDITIONAL DEMAND: <br />(N)WATER HEATER = 250mbh <br />(N) KITCHEN APPLIANCES = 4716mloh <br />(N) COFFEE ROASTER • 56mbh <br />TOTAL METER DEMAND III 522mloh <br />PLUMBING CONTRACTOR TO COORDINATE GAS METER CAPACITY <br />WITH PG4E. <br />O $ P.O.G. CONNECT (N) 2" G TO METER DISCHARGE AND EXTEND <br />INTO BUILDING AND ROUTE AS INDICATED. <br />O3 $ P.O.C. CONNECT (N) 3" SS TO (E) SS THIS LOCATION. <br />® $ P.O.C. CONNECT 3/4" CW TO (E) CW AND EXTEND TO REMODELED <br />RESTROOM. <br />O5 PROVIDE CIRCUIT SETTER 5ALANCING VALVE ON 14WR LINE. <br />© PROVIDE I" G w/ GAS COCK 4 FLEXIBLE CONNECTION TO <br />COFFEE ROASTER <br />0 (E) 4" SS TO BUILDING. <br />OS (E) 3" GW TO (E) GREASE INTERCEPTOR <br />APPENDIX A CALCULATION <br />1. PRESSURE AVAILABLE AT STREET MAIN . . . . . . . . . <br />40.00 <br />PSI. <br />2. PRESSURE LOSS DUE TO HEIGHT 4 Ft. x 0.434. <br />1.74 <br />PSI. <br />3. PRESSURE LOSS THRU METER . . . . . . . . . . . . . <br />3.00 <br />PSI. <br />4. PRESSURE LOSS DUE THRU OTHER DEVICES . . . .. . <br />F.T. <br />F.V. <br />Softner, BLOSSo. <br />F.V. <br />51.eTOTAL PRESSUREWater .Pre(addelines 2 thru 4) . . <br />4.074 <br />PSI. <br />6. PRESSURE REQUIRED AT HIGHEST FIXTURE . . . . . <br />20.00 <br />PSI. <br />7. PRESSURE AVAILABLE FOR FRICTION LOSS . . . . . <br />15.26 <br />PSI. <br />(Subtract lines 5 & 6 from line 1) . . . . . . . . . . . . <br />3/4" <br />1 <br />8. TOTAL DEVELOPED LENGTH OF RUN . . . . . . . . . . <br />150 <br />ft. <br />FRICTION LOSS CALCULATION <br />1" <br />15 <br />From line 7 15.26 PSI x 100 = 10.17 / 100 ft. <br />1/4" <br />36 <br />From line 8 1 70 ft. <br />11/4 <br />28 <br />USE 5.0 PSI/100FT <br />1'/2" <br />AS A SAFETY <br />23 <br />1/2" <br />DOMESTIC COLD WATER SIZING CHART <br />DOMESTIC NOT WATER SIZING CHART <br />Stockton, CA 95207 <br />F.U.PIPE <br />Suite 125 <br />F.U. <br />PIPE SIZE <br />209.944.5711 F <br />SIZE <br />RESTORE <br />F.T. <br />F.V. <br />F.T. <br />F.V. <br />12.20.17 <br />/2" <br />2 <br />-- <br />/2" <br />2 <br />-- <br />3/4" <br />1 <br />__ <br />3/4" <br />1 <br />-_ <br />1" <br />20 <br />-- <br />1" <br />15 <br />1/4" <br />36 <br />6 <br />11/4 <br />28 <br />-- <br />1'/2" <br />14 <br />23 <br />1/2" <br />46 <br />10 <br />2" <br />236 <br />116 <br />2" <br />115 <br />42 <br />2/2" <br />419 <br />365 <br />2/211 <br />236 <br />116 <br />3" <br />809 <br />115 <br />3" <br />455 <br />329 <br />THE SIZING CHART IS BASED ON <br />THE 2016 GPC APPENDIX 'A' <br />WITH A OP OF 5.0 PSI PER 100 FT <br />w/ MAXIMUM VELOCITY OF Sft/SEG. <br />THE SIZING CHART IS BASED ON <br />THE 2016 GPC APPENDIX 'A' <br />WITH A OP OF 5.0 PSI PER 100 FT <br />w/ MAXIMUM VELOCITY OF 5ft/SEG. <br />PLUMBING GENERAL NOTES <br />1. FOR FIX. CONNECTION SIZES TO THE VARIOUS FIXTURES, <br />REFER TO THE FIX. CONNECTION SCHEDULE ON THIS SHEET PS.I. <br />2. PER CALIFORNIA ENERGY CODE SECTION 1103, <br />HOT WATER DELIVERED FROM PUBLIC USE LAVATORIES <br />SHALL 5E LIMITED TO A TEMPERATURE OF 110'F. THE <br />WATER HEATER THERMOSTAT SHALL NOT BE CONSIDERED <br />A CONTROL FOR MEETING THIS PROVISION, THEREFORE <br />ALL PUBLIC USE LAVATORIES SHALL HAVE FAUCETS <br />WITH INTERNAL TEMPERATURE LIMIT STOPS. <br />3. SLOPE ALL SANITARY SEWER LINES WITHIN BUILDING AT 1/4"/FT. <br />4. ALL HOT WATER PIPING SHALL 5E COPPER /2" THRU 3/4" <br />REQUIRES I" INSULATION. P AND LARGER REQUIRES 11/2" <br />INSULATION. <br />5. PLUMBING CONTRACTOR TO COORDINATE WITH <br />MECHANICAL CONTRACTOR AND ELECTRICAL <br />CONTRACTOR TO ELIMINATE ANY SPACE CONFLICTS. <br />6. INSTALLATION OF (N) SS IN BASEMENT FLOOR REQUIRES SAW <br />CUTTING OF (E) SLAB. <br />ALEXANDER SCHEFLO <br />and ASSOCIATES, Inc. <br />Mechanical Engineers (209) 948-9761 <br />2926 Pacific Ave. Stockton, Ca. 95204 <br />ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN <br />CONSTITUTE THE ORIGINAL AND UNPUBLISHED WORK OF THE <br />ENGINEER AND THE SAME MAY NOT BE USED, DUPLICATED, OR <br />DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE ENGINEER. <br />\c) Alexander Scheflo & Assoc., Inc <br />WMB <br />ARCHITECTS <br />5757 Pacific Avenue <br />Suite 226 <br />Stockton, CA 95207 <br />2000 L Street <br />Suite 125 <br />Sacramento, CA 95811 <br />209.944.9110 T <br />209.944.5711 F <br />www.wmbarchitects.com <br />RESTORE <br />1200 N. Center Street <br />Stockton, Ca. <br />REMODEL PLUMBING <br />FLOOR PLAN <br />12.20.17 <br />Resubmittal <br />PUBLISH HISTORY <br />N", DATE REVISION/ SET <br />1 11.13.17 PLAN CHECK #1 <br />WMB PROJECT: <br />17-067 <br />P2.1 <br />