Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87 91 Diesel <br /> Are both vent and tank riser piping F Yes Yes Yes Yes <br /> secondarily contained? ® No No No No <br /> OPE Model 71 SO 71 SO 71 SO <br /> What is the OPE response when Ej Shut off E Shut off F1 Shut off Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) ® Restricts ®Restricts ® Restricts r Restricts <br /> Flow Flow Flow Flow <br /> E] Audible El Audible ® Audible ® Audible <br /> Alarm Alarm Alarm Alarm <br /> r Visual ® Visual ® Visual ® Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping El Yes* Yes* ® Yes* ® Yes* <br /> that may interfere with the OPE operation? F1 No No F1 No rl No <br /> At what level in the tank is the OPE set to 103" 105° 102.25" <br /> activate? Inches from bottom of tank <br /> What is the percent capacity of the tank at 93% 94% 93% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to M Yes F1 Yes* F Yes* Yes* <br /> respond when the stored substance rl No rl No rj No No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results Pass I✓ Pass F1 Pass Pass <br /> ® Fail ® Fail ® Fail ® Fail <br /> 8. COMMENTS <br /> Describe all answers marked "No"or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> Work completed on SR0085216 <br /> * Mark here if: <br /> Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and !n-Tank Setup report(s) <br /> Page 2 of 2 <br />