Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer D Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum 0 Hydrostatic <br /> Test Equipment Used: 1 hour Water test <br /> Sump/UDC ID UDC 1/2 UDC 3/4 UDC 5/6 <br /> Sump Manufacturer Environ Environ Environ <br /> Sump Depth (inches) 31" 31" 31" <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration 18" 18" 18" <br /> (inches) <br /> Test Start Time 10:00 am 10:00 am 10:00 am <br /> Initial Reading 17.50" 16.625" 17.250" <br /> Test End Time 11:00 am 11:00 am 11:00 am <br /> Final Reading 17.50" 16.625" 17.250" <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria .125" .125" .125" <br /> Tightness Test Results p Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail ❑ Pass ❑ Fail <br /> Sump/UDC ID <br /> Sump Manufacturer <br /> Sump Depth (inches) <br /> Sump Bottom to Top of <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />