My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2022 9:18:32 AM
Creation date
3/28/2022 8:14:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0517272
PE
2361
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
01
SITE_LOCATION
15237 N Thornton Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill,Overfill,Leak Detection and Secondary Containment Pquipment at UST Facilities <br /> mary containment of secondarily contained spill <br /> buckets. WARNING: Use only an air-operated vacu- <br /> um source or a vacuum pump powered by <br /> 6.3.2 Description of Test. Using a specially an explosion-proof motor. Vacuum pumps <br /> equipped test cover, a partial vacuum is applied to with electric motors that are not explo- <br /> the spill bucket.The vacuum level is monitored for sion-proof may ignite flammable vapors. <br /> a 1-minute period. If a portable air compressor is used, it <br /> should be located at least 20 feet away <br /> 6.3.3 Test Equipment. Test equipment shall from the venturi-eductor or outside any <br /> include: Class I, Division 1.area. <br /> • Vacuum test apparatus (The test apparatus may <br /> be available from the spill bucket manufacturer. 6.3.4 Preparation. <br /> It includes an air pressure regulator, a vacuum <br /> source, a vacuum gauge with a minimum 0-50 1.Remove and properly dispose of any liquid and <br /> inch water column range and a control valve.The debris (leaves, sediment and trash) in the spill <br /> control valve is used to adjust the vacuum level.); bucket.Clean the spill bucket and examine it for <br /> • Test cover (The cover is equipped with a test damage, defects or improperly installed compo- <br /> fitting.); nents. If there are loose components (e.g., loose <br /> band clamps or bolts),tighten these items before <br /> • Plumber's plug(appropriate size,if used); performing the integrity test. If there are items <br /> Stopwatch or other time-measurement device that must be repaired or replaced (e.g., deterio- <br /> capable of measuring a 1-second increment; rated gaskets/seals or drain valves), notify the <br /> ownerloperator to obtain approval before pro- <br /> • Gasketing material (The purpose of the gas- ceeding with the needed repairs. <br /> keting material is to provide an air-tight seal <br /> 2 <br /> between the test cover and the spill bucket.). .Examine the fill cap and adapter fitting for <br /> loose, missing or damaged parts and make nec- <br /> essary repairs.Make sure that the seal on the fill <br /> o-so"water column cap is present and in good condition. The cap <br /> Vacuum Vacuum Gauge must fit securely and be leak-tight on the riser. <br /> Source _ A leaking cap will result in a failed test. As an <br /> alternative to a tight fill cap, use a plumber's <br /> plug in the fill riser. <br /> Control 3.The spill bucket drain valve, if resent,must be <br /> Valve p p <br /> leak-tight to pass the test. If the drain valve is <br /> not leak-tight, it may be removed and perma- <br /> nently plugged. <br /> NOTE; Before permanently plugging, ensure <br /> that local regulations allow the drain valve to <br /> Plumber's Plug in <br /> Tank Riser Pipe.. be permanently plugged. <br /> 4.Clean any contamination from the top surface <br /> of the spill bucket where the cover makes a seal <br /> and line it with gasketing material. <br /> 5.Place the test cover on the spill bucket, con- <br /> firming that it makes a tight seal with the Bas- <br /> keting material. <br /> FIGURE 6-2. The cover must make a tight seal with the 6.Connect the line from the vacuum source to the <br /> spill bucket to prevent leakage when the vacuum is adapter on the cover. <br /> pulled during the test. <br /> 7.If the spill bucket is found to have cracks,loose <br /> parts or separation of the bucket from the fill <br /> pei.org <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.