Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. IN-TANK GAUGING TESTING <br /> 0 Check this box if tank gauging is used only for inventory control. <br /> 0 Check this box if NO tank gauging equipment is installed. Yes No NA <br /> Do not complete this section if either box is checked. <br /> All wiring has been: 1) visually inspected for kinks, breaks and proper entry and El r] ❑ <br /> termination; and 2 tested for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup 17 In ❑ <br /> to ensure that floats move freely, functionally tested, and confirmed operational? <br /> Was accuracy of system's product level readings tested? 17 1 0 0 <br /> Was accuracy of system's water level readings tested? 17 17 [E] <br /> Were all probes reinstalled properly? © 17 <br /> Were all items on the equipment manufacturer's maintenance checklist completed? © 0 ❑ <br /> Probe ID Probe Model Tanks Monitored Pass Fail <br /> T1: Mag7 846390-109 Tank 1 Diesel AST 0 ❑ <br /> T2: Mag7 846390-109 Tank 2 Diesel AST 0 ❑ <br /> T3: Mag7 846390-109 Tank 3 Diesel AST 0 ❑ <br /> T5: Mag7 846390-109 Tank 5 Bio AST r ❑ <br /> © ❑ <br /> © ❑ <br /> 9. COMMENTS <br /> Describe all answers marked "No"or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> -Site is equipped with Omtech Pump Controler that alternates the AST turbines. Both Diesel <br /> AST turbines were turned on at the same time to check for positive shutdown. <br /> -Isolated the Line Leak Detector by turning off one of the turbines at the Omntec controller. <br /> -Omntec controller was returned to original position before departure. All Passed. <br /> Page 5of6 <br />