Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. IN-TANK GAUGING TESTING <br /> 0 Check this box if tank gauging is used only for inventory control. <br /> 0 Check this box if NO tank gauging equipment is installed. Yes No NA <br /> Do not complete this section if either box is checked. <br /> All wiring has been: 1) visually inspected for kinks, breaks and proper entry and F1 r] ❑ <br /> termination; and 2 tested for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup <br /> to ensure that floats move freely, functionally tested, and confirmed operational? <br /> Was accuracy of system's product level readings tested? 0 <br /> Was accuracy of system's water level readings tested? <br /> Were all probes reinstalled properly? <br /> Were all items on the equipment manufacturer's maintenance checklist completed? F1 0 ❑ <br /> Probe ID Probe Model Tanks Monitored Pass Fail <br /> T1 846390-109 Tank 1 87 Unleaded ❑✓ ❑ <br /> T2 846390-109 Tank 2 87 Unleaded ❑r ❑ <br /> T3 846390-109 Tank 3 87 Unleaded ❑✓ ❑ <br /> T4 846390-109 Tank 4 87 Unleaded r ❑ <br /> T5 846390-109 Tank 5 Premium F] ❑ <br /> © ❑ <br /> 9. COMMENTS <br /> Describe all answers marked "No"or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> *Cold Start Monitor Certification ONLY* <br /> Installed new Veeder-Root Software (336.02). <br /> Probes were conducted due to being wired to the Veeder-Root Panel. <br /> Line Leak Detectors were not conducted due to being mechanical. <br /> Page 5of6 <br />