My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2023 9:17:45 AM
Creation date
3/28/2022 12:39:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Monitoring System Certification Form <br />------------- <br />t I <br />Name: LV Inputs <br />Enabled: <br />Active State: Nigh <br />Action: None <br />-------- ________________ <br />Channel 2 <br />------------------------ <br />Name: LV Input 2 <br />Enabled: Yes <br />Active State: Nigh <br />Action: None <br />TS -TPI <br />-- --------------------- <br />Enable Interface: No <br />------------------------ <br />Relays <br />------------------------ <br />Channel 1 <br />- ---------------------- <br />Name: TURBINE 1 <br />Enabled: yes <br />Type: Submersible Pump <br />Polarity: Normal <br />Logic:OR Logic <br />Physically Wired As: <br />Horror lly Open <br />Number of inputs: 2 <br />----------------------- <br />Input <br />--------------------- <br />Input 1 <br />------------------------ <br />Type: RC Input Module <br />Channel: HOOK SIGNAL <br />------------------------ <br />Input 2 <br />------------------------ <br />Type:1-20M Input Module <br />Channel: SUPPLY LINE <br />------------------------ <br />Channel 2 <br />------------------------ <br />Name: ALARM OUTPUT <br />Enabled: yes <br />Type: Submersible Pump <br />Polarity: Normal <br />Logic: OR Logic <br />Physically Wired As: <br />Normally Open <br />Number of inputs: 0 <br />------------------------ <br />Fuel Management System <br />________________________ <br />Ullage Percent: 95 a <br />Delivery Delay: 15 min <br />Correction Temperature: <br />68.08 •F <br />Nigh Product Limit:Level <br />Tank Lou Product Limit: <br />Volume <br />----------------------- <br />Stated Tank Testing <br />--------------- -------- <br />Region: United States <br />Monthly Leak Test Thresh <br />old: 0.20 gph <br />Nearly Leak Test Thresho <br />Id: 0.10 gph <br />Sentinel Mode Threshold: <br />S.Be gph <br />Confidence: 99% <br />Minimum Leak Test Time: <br />2 hr <br />Maximum Leak Test Time: <br />B hr <br />Alarm On Precision Leak <br />Test Failure: No <br />________________________ <br />Lines <br />------------------------ <br />Number of Lines: 1 <br />------'---------------- <br />Line 1 <br />------------------------ <br />Name: SUPPLY LINE IN <br />Submersible Pump Module: <br />Power Supply Module <br />Submersible Pump Channel <br />TURBINE 1 <br />Transducer: SUPPLY LINE <br />Enable SLLD: No <br />Page 8 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.