My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2023 9:17:45 AM
Creation date
3/28/2022 12:39:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Electronic Leak Detector Test Data Sheet <br />Site Name Lodi CA FO Term <br />Address 2500 West Turner Road Lodi 95242 <br />Test Information <br />Date 03-30-2022 <br />Comments <br />This letter certifies that the annual leak detector tests were performed at the above referenced facility <br />according to the equipment manufacturers procedures and limitations and the results as listed are to my <br />knowledge true and correct. The electronic leak detector test pass/fail is determined using a low flow <br />threshold trip rate of 3 gph at 10 PSI. <br />Inspected By: Contractor <br />Technician <br />Signature <br />Sunwest Engineering <br />Kraig Kinder <br />a <br />Lic# 703190 <br />1 2 3 4 5 <br />Product <br />Diesel <br />Manufacturer <br />Incon <br />Model <br />TS -LSU -500 <br />Full Operating Pressure (PSI) <br />25 <br />F/E Holding Pressure (PSI) <br />22 <br />Did Alarm sound with 3GPH test. <br />Y <br />How many turbine cycles before <br />2 <br />Is turbine shut down when in alarm. <br />N <br />Test Leak Rate (ml/min)(gph) <br />189 <br />PASS or FAIL <br />Pass <br />Comments <br />This letter certifies that the annual leak detector tests were performed at the above referenced facility <br />according to the equipment manufacturers procedures and limitations and the results as listed are to my <br />knowledge true and correct. The electronic leak detector test pass/fail is determined using a low flow <br />threshold trip rate of 3 gph at 10 PSI. <br />Inspected By: Contractor <br />Technician <br />Signature <br />Sunwest Engineering <br />Kraig Kinder <br />a <br />Lic# 703190 <br />
The URL can be used to link to this page
Your browser does not support the video tag.