My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2358
>
2300 - Underground Storage Tank Program
>
PR0231756
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 1:02:02 PM
Creation date
3/28/2022 4:37:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231756
PE
2361
FACILITY_ID
FA0006343
FACILITY_NAME
STOCKTON MOBIL 3*
STREET_NUMBER
2358
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14118221
CURRENT_STATUS
01
SITE_LOCATION
2358 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2358 East Waterloo Road PR0231756 <br /> April 28, 2022 Program: UST <br /> PHOTO 2: The designated operator failed to check and note the correct test dates for the overfill prevention on the designated operator inspection report <br /> dated 3/11/2022. <br /> Underground Stora <br /> Designated UST O 9e Tank <br /> CONTRACTORS Aerator Visual Inspection Pection Report <br /> Fe,(209)as,-e 10.TESTING AND MAINTENANCE Date last <br /> Has monitoring system certification been completedYes No NA <br /> 12 months? pe1{orme' <br /> within the past <br /> 4/07/21 <br /> 12months? <br /> spill� testing been completed within the past <br /> �`1 { 04/07/21 <br /> Has overfill ❑✓ ❑ <br /> Prevention equipment inspection been <br /> t'-rte the past 36 months? completed within ❑ ❑ 11/22/19 <br /> Has secondary containment testing been completed <br /> 36 months? within the past <br /> �nE Has tank tightness testing been completed ❑✓ E] ❑ 03/03/21 <br /> timeframes? p within required <br /> Has line tightness testing been completed within the re ❑ ❑ ❑ <br /> timeframes? quired <br /> Other Test/Maintenance: ❑ ❑ ❑✓ <br /> S Other Test/Maintenance: ❑ ❑ ✓❑ <br /> Other Test/Maintenance: ❑ ❑ <br /> 11.FACILITY EMPLOYEE TRAININGs ✓ <br /> Have all individuals performing facility employee duties received the required facility <br /> employee training within the past 12 months? Yes No <br /> 13,COMMENTS <br /> deThis section maybe used to record comments or obse nations that are not current compliance <br /> ficiencies. <br /> i <br /> All answers marked"NO"Must be described by the designated UST operator i <br /> n Section 3. 1 <br /> F'age 4 of 4 <br /> Lydia Baker, SR. REHS Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.