Laserfiche WebLink
SUBWAY TILE TO START ABOVE TILE BASE <br />INTERIOR FINISH REFER TO A300 FOR TO CREATE INTEGRAL COVE <br />WALL TYPES <br />L <br />ANSITION STRIP 5/8" CEMENTIOUS BOARD TO 12" A.F.F. <br />PRE -MANUFACTURED COOLER / <br />(TYP. @ ALL TILE BASES) <br />FREEZER WALL <br />NTIOUS BOARD TO 12" A.F.F. COVE BASE TILE AS SCHEDULED <br />LL TILE BASES) <br />NPi CAULK BETWEEN CEMENTIOUS BOARD <br />1/4" CEMENTIOUS BOARD w/ 45° K BETWEEN CEMENTIOUS BOARD &CONCRETE <br />CHAMFER ETEFLOOR TILE AS SCHEDULED <br />OOR w/INTEGRATED <br />EPDXY FLOOR w/INTEGRATED E AS SCHEDULED <br />31e R COVE BASE AS SCHEDULED _ <br />MN' 2'-0" MIN SLOPE <br />2'-0" MIN SLOPE <br />EPDXY BASE @ WALK-IN F11/2"4-0.7 EPDXY BASE DETAIL 11/2"=1'-0" <br />(31/ TILE BASE DETAIL <br />GENERAL NOTES <br />1. REFER TO ALL PLANS IN THIS PACKAGE FOR ADDITIONAL INFORMATION. <br />SCHEDULED TILE PER PLAN 2. REFER TO STRUCTURAL DRAWINGS FOR ADDITIONAL INFORMATION. <br />SCHLUETER QUADEC 3. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION. <br />GROUT 4. EPDXY NOTE: <br />THE FINISH WILL BE SMOOTH BELOW EQUIPMENT & SLIP RESISTANT IN WALKWAYS w/ FLOOR DRAINS <br />SCHEDULED TILE PER PLAN % PROVIDED TO WASH DOWN THE FLOORS. EPDXY TO BE APPLIED OVER THE 5/8" DUROCK AT BOTTOM OF <br />CABINET ` WALLS AND HAVE A 3/8" COVED BASE THAT EXTENDS 6" UP THE WALL. AT OUTSIDE OF FREEZER/COOLER <br />PANELS AND THE INSIDE OF COOLER PANELS 6" TALL STRIPS OF 1/4" DUROCK ARE ADHERED TO BOTTOM <br />OF PANELS w/ CONSTRUCTION ADHESIVE AND SELF TAPING SCREWS ALTERNATING HIGH AND LOW <br />rn PLACEMENT AT 8" ON CENTER. EPDXY COVED BASE TO BE POURED OVER DUROCK STRIPS AT <br />FREEZER <br />FREEZER/COOLER PANELS. NO EPDXY FLOORING IN FREEZER NEEDED w/ METAL FLOORING SYSTEM <br />110 DRIVE 6 ��1 3 <br />PROVIDED BY MANUFACTURER. <br />I <br />NO FINISH BEHIND FREEZER �_ THRU FRP1 J COOLER 2 <br />OR COOLER TAPE & PRIME 7TB A23a 5. COVE BASE NOTE. <br />FRPi 108 109 TYF FTBi 3/8" INTEGRAL COVED BASE THAT EXTENDS A MINIMUM OF 4" UP THE WALL IS PROVIDED IN THE <br />GYP. BD. & DUROCK ( 2 FOOD CUSTOMER COUNTER AREA SELF-SERVICE BEVERAGE COUNTER AND IN THE RESTROOMS. THIS <br />_ NO FINISH BEHIND COOLER WOME MEN'S ( ) <br />y PREP EP -1 WOMEN!S INCLUDES ALL REQUIRED FLOOR/WALL JUNCTURE, FLOORICOUNTER TOE KICK JUNCTURE, FLOOR/MOP <br />NO EPDXY FLOORING UNDER 107 TAPE&PRIME GYP. BD. & 112 111 SINK JUNCTURE OF ANY LOW WALL MOUNTED MOP SINK, FLOOR / ELEVATED FLOOR SINK JUNCTURE AND <br />FREEZER j DUROCK <br />2 <br />SST ® — CONTINUOUS COVED BASES. ALL OUTSIDE TILE CORNERS WILL HAVE MITERED EDGES. <br />FT1 <br />3 8 �f FTi 6. COUNTERTOP LAMINATE NOTE: <br />�i COUNTER TOPS ARE FINISHED PER SCHEDULE UNLESS NOTED OTHERWISE. INTERIOR SURFACED TO BE <br />A 30 3 SST / L <br />SST FINISHED w/ SAME OR WHITE PLASTIC LAMINATE w/ NO EXPOSED BARE WOOD ALLOWED IN CABINETS, <br />SST SST FRPi SHELVING OR UNDERSIDE OF COUNTERS. <br />S%� I I I I (� N 7. TILE NOTE: <br />V H L V E T E R Q V AD E VFl�j 6 0 ALL TILED AREAS WHERE WATER WILL BE PRESENT (RESTROOM SERVING, ETC...) SHALL COMPLY w/ <br />.1 " ( 2� =/ FRP1 FRP1 U FRPi SECTION 1210.2 & 1210.3 OF 2016 CBC. TILE WILL BE APPLIED OVER MR. GYP. BD. & DUROCK & HAVE A <br />\ KITCHEN E CLT COVED BASE THAT EXTENDS A MIN OF 4" UP THE WALL. REFER TO INTERIOR ELEVATIONS, PARTITION <br />FRPi 115 TYPES & RESTROOM PLAN GENERAL NOTES FOR ADDITIONAL INFORMATION. ALL OUTSIDE CORNERS AT <br />EP -1 <br />EP 1 iO4 1 DINING ROOM BASE TILE TO HAVE MITERED EDGES. <br />SST {_ 2 1 � WC1 � HALL PT4 <br />SST FRP1 SCULLERY/ FTBi WCi 8. TITLE 24 FINISH NOTE: <br />EXTERIOR DOOR DRY STORAGE PTI F113 I PTi <br />FRPi 106 FTBi WCi INTERIOR FINISH SHALL BE PROVIDED IN ACCORDANCE w/ 2016 CBC (TITLE 24) SECTION 804 AS FOLLOWS: <br />&STOREFRONT FRP1 — FTBi <br />CT2 5 OFFICE 6 FRPCLASS I VERTICAL ENCLOSURES; CLASS II CORRIDORS, CLASS III ROOMS. PROVIDE SMOOTH, NON <br />0 6�- ABSORBENT, WASHABLE FINISH MATERIALS FOR THE COVE BASE, WALLS, FLOORS, AND CEILINGS IN ALL <br />W/H EMPLOYEE AREAS INCLUDING WALK-IN COOLERS, LOCKER AND JANITORIAL AREAS, ETC. EPDXY FLOORS <br />w 114 CAN BE CAN BE SLIP RESISTANT IN HIGH TRAFFIC AREAS BUT EPDXY FLOORS OR CEILINGS CANNOT BE <br />0 z ALIGN TILE W/ THRESHOLD <br />1° CF EP -i ROUGH IN ANY EMPLOYEE AREAS EVEN IN HIGH TRAFFIC AREAS. <br />w m 2 [6 <br />FRP1 <br />0 FTai yBi <br />KEY NOTES <br />7 <br />° SST <br />PT3 <br />i <br />a a ° FLOOR TILE/GROUT REF FLOOR ORDER EXPO FRPi PT� WCi <br />COUNTER EP -1 103 BEHIND i05 ,/ FLOOR DRAIN /SINK, REFER TO PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION. <br />a PATTERN PLAN FOR LAYOUT 102 EQU 1 INSTALL FLOOR SINK AT EDGE OF CONCRETE PLATFORM AT SERVING AS SHOWN ON <br />1 8 PLANS <br />a a CONCRETE SLAB ON GRADE FRP1 ® FRP1 ALL BACK OF HOUSE AREAS TO HAVE STAINLESS STEEL CORNER GUARDS/CAPS OVER FRP <br />THRESHOLD -SEE HARDWARESCHEDULE <br />0 AT OUTSIDE CORNERS FROM TOP OF EPDXY BASE TO CEILING, PROVIDED AND INSTALLED <br />7 O <br />MAXIMUM CHANGE IN LEVEL SHALL BE 1/2" 9 CT2 BY F.S.E.C. <br />OPENING FULL PANEL BETWEEN <br />BY F S ALC FINISH AND COOLER / FREEZER PANEL SURFACE, SEAL <br />PTiCLOSURE <br />EXTERIOR EXPANSION JOINT FOR REFERENCE ONLY 9 <br />4 r ® MTL-2, TILE / EPDXY TRANSITION STRIP, REFER TO DETAIL 4/A230 FOR ADDITIONAL INFO. <br />FT1FTB1 <br />g PTIB <br />EP-1 TO BE RAN UP ALL THREE SIDES OF MOP SINK UP TO BOTTOM OF PLATFORM, REFER <br />iV0TO DETAIL 3/A200 FOR ADDITIONAL INFORMATION <br />i WCi FTBi FTBi <br />© EPDXY FLOORING TO BE SMOOTH UNDER ALL EQUIPMENT <br />WCt <br />FTB1 � � - - <br />FORMED <br />RFOR CONCRETE <br />LATFORM INFORMATION FOR CASEWORK AND/OR EQUIPMENT. REFER TO SHEET <br />THRESHOLD @ ENTRY DOOR 1"=r -o" 5 FTB1 r - —=-A200 <br />WCi ® PROVIDE FLOOR TILE W/ Ye" GOUT JOINT & Y OFFSET <br />FTi G.C. TO PROVIDE AND INSTALL SCHLUETER QUADEC @ CORNER OF COUNTERS <br />8 WCi DINING WCi SEE DETAIL 6/A230 <br />97 <br />T1 FTBi <br />8 101 FTB1 <br />5 <br />A230 <br />WC1 <br />EP -1, EPDXY FLOORING FTFTBi <br />FTI FT81 <br />MTL•2, TRANSITION STRIP WCi <br />SCHEDULED TILE PER PLAN �--- T Bi PT' <br />f PTi PTi <br />GROUT PTi WC1 ; <br />WCi WD1 <br />WD1 ENTRYr FTB1 <br />CONCRETE SLAB FTBi 7 QUEUE FT81 <br />FTBi <br />A500 ipp <br />o a " <br />e <br />FINISH SCHEDULE <br />— SEE SHEET A205 <br />N <br />TILE / EPDXY TRANSITION 1-1/2"=1'-0" 4 FINISH PLAN <br />M@0 C G°30LL <br />Se.' <br />w <br />Q <br />M <br />LO <br />CD <br />N <br />W <br />U <br />U) <br />Q <br />0 <br />U <br />L1J <br />0 <br />z <br />M <br />Q <br />CNM <br />r <br />Project Number: 17-536 <br />Plan Check Number. <br />10/12/17 ISSUE FOR PERMIT <br />S H E E T <br />A230 <br />