My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WARREN
>
1555
>
1900 - Hazardous Materials Program
>
PR0520351
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2022 11:29:24 AM
Creation date
3/30/2022 8:42:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0520351
PE
1921
FACILITY_ID
FA0010502
FACILITY_NAME
ALMOND ACE PACKING INC
STREET_NUMBER
1555
STREET_NAME
WARREN
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534032
CURRENT_STATUS
01
SITE_LOCATION
1555 WARREN RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERS Consolidated Emergency Response / Contingency Plan <br /> INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY (Check all that apply) : C 1 . <br /> 1- 1 . VERBAL WARNINGS ; E] 2 . PUBLIC ADDRESS OR INTERCOM SYSTEM; RH . TELEPHONE; <br /> ❑ 4 . PAGERS ; RqJ . ALARM SYSTEM; RL64 PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY (Check all that apply) : c12. <br /> 0C 1 . VERBAL WARNINGS ; ❑ 2 . PUBLIC ADDRESS OR INTERCOM SYSTEM; 3 . TELEPHONE; <br /> ❑ 4. PAGERS ; ❑ 5 . ALARM SYSTEM; ❑ 6 . PORTABLE RADIO <br /> EMERGENCY COORDINATOR CONTACT INFORMATION: c136 <br /> PRIMARY EMERGENCY COORDINATOR NAME : v 10,5 � � HONE NO . : ' ` PHONE NO . : <br /> ALTERNATE EMERGENCY COORDINATOR NAME: t5. tires } S PHONE NO . : - ? � ONE NO . : ` <br /> ❑ Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO . : <br /> Note : If more than one alternate emergency coordinator is designated, attach a list in order of responsibility. <br /> D . EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check the applicable boxes to indicate your facility ' s procedures for containing spills and preventing and mitigating releases, fires and/or explosions . <br /> We <br /> 5414 MONITOR FOR LEAKS , RUPTURES , PRESSURE BUILD -UP , ETC . ; <br /> ❑ 2 . PROVIDE STRUCTURAL PHYSICAL BARRIERS (e. g. , Portable spill containment walls, built-in berms) ; <br /> ❑ 3 . PROVIDE ABSORBENT PHYSICAL BARRIERS (e . g. , Pads, spill pigs, spill pillows) ; <br /> 4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS ; <br /> ❑ 5 . LINED TRENCH DRAINS AND/OR SUMPS ; <br /> ❑ 6 . AUTOMATIC FIRE SUPPRESSION SYSTEM; <br /> ❑ 7 . ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS ; <br /> [:184 STOP PROCESSES AND/OR OPERATIONS ; <br /> ❑ 9 . AUTOMATIC / ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM ; <br /> 10 . SHUT OFF WATER, GAS , ELECTRICAL UTILITIES ; <br /> 11 . CALL 9- 1 - 1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID ; <br /> ® 12 . NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS ; <br /> R13 , ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br /> 14. PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br /> 15 , REMOVE CONTAINERS AND/OR ISOLATE AREAS ; <br /> ❑ 16 . HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> ❑ 17 . USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br /> ❑ 18 . VACUUM SUCTION USING APPROPRIATE VACUUM (e. g. , Intrinsically safe) FOR SPILL CONTROL AND/OR CLEANUP ; <br /> [919 . DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br /> ❑ 20 . PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS ; <br /> D2. <br /> ❑ 21 . OTHER (Specify) : <br /> E . FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNALS) WILL BE USED TO BEGIN EVACUATION OF THE FACILITY (Check all that apply) : Er . <br /> ❑ 1 . BELLS ; E2. <br /> C . HORNS/SIRENS; <br /> . VERBAL (i . e. , Shouting); <br /> ❑ 4 . OTHER (Specify) : <br /> THE FOLLOWING LOCATION(S) WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S) (e.g. , Parking lot, street corner): E3 . <br /> Note : The Emergency Coordinator must account for all onsite employees and visitors after evacuation . <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS : E4. <br /> L WRITTEN PROCEDURES DESCRIBING ROUTES , EXITS, AND ASSEMBLY AREAS ; <br /> EVACUATION MAP(S ) DEPICTING ROUTES , EXITS , AND ASSEMBLY AREAS ; <br /> 3 . OTHER (Specify) : E5 . <br /> Note : Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan, <br /> F . ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES (Check one of the following) : Fl . <br /> ,� 1 . HAVE BEEN DETERMINED NOT NECESSARY; <br /> F2. <br /> ❑ 2 . THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE (Specify) : <br /> Note : Advance arrangements with local fire and police departments, hospitals, state and local emergency response teams , and/or emergency services <br /> contractors should be made for your facility, if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br /> Rev. 03 /07/17 Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.